Passage Data · Check a report · Use it from your AI

Duke Energy Carolinas LLC

Electric Services, major discharger, Terrell, North Carolina. NPDES permit NC0004987, in force until Mar 31, 2027. Last 12 months: over a limit 10 times (last August 2026), 34 required values missing, 5 of 54 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 31 days after each period: outfall 001 form M monthly (4 values), outfall 002 form M monthly (15 values), outfall 005 form M monthly (16 values), outfall 006 form M monthly (1 value), outfall 008 form M monthly (2 values)
Renewal application due
Oct 2, 2026 · 180 days before expiry; your permit may set another date
Last report on file
August 2026
Oct 2024 – Sep 2025
10 values over a limit, 151 required values missing, 4 of 48 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
October 2025Iron, total [as Fe], 30-day average2.67≤ 1 mg/L167%
October 2025Iron, total [as Fe], daily maximum2.67≤ 1 mg/L167%
May 2026Copper, total [as Cu], 30-day average6.2≤ 1 mg/L520%
May 2026Copper, total [as Cu], daily maximum6.2≤ 1 mg/L520%
June 2026Copper, total [as Cu], 30-day average20.9≤ 1 mg/L1990%
June 2026Copper, total [as Cu], daily maximum20.9≤ 1 mg/L1990%
July 2026Copper, total [as Cu], 30-day average5.55≤ 1 mg/L455%
July 2026Copper, total [as Cu], daily maximum5.55≤ 1 mg/L455%
August 2026Copper, total [as Cu], 30-day average4.04≤ 1 mg/L304%
August 2026Copper, total [as Cu], daily maximum4.04≤ 1 mg/L304%

Limits in force (40)

ParameterStatisticLimitMonthsOutfall
Temperature, water deg. centigrade30-day average≤ 34.4 deg CJul–Oct001
Temperature, water deg. centigrade30-day average≤ 33.3 deg CJan, Feb, Mar, Nov, Dec001
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year001
Chlorine, free available30-day average≤ .2 mg/Lall year001
Chlorine, free availabledaily maximum≤ .5 mg/Lall year001
Turbiditydaily maximumreport only (NTU)all year002
pHdaily minimum≥ 6 SUall year002
pHdaily maximum≤ 9 SUall year002
Solids, total suspended30-day average≤ 20 mg/Lall year002
Solids, total suspendeddaily maximum≤ 50 mg/Lall year002
Oil & Grease30-day average≤ 9 mg/Lall year002
Oil & Greasedaily maximum≤ 12 mg/Lall year002
Hardness, total [as CaCO3]daily maximumreport only (mg/L)all year002
Arsenic, total [as As]daily maximumreport only (ug/L)all year002
Copper, total [as Cu]daily maximumreport only (mg/L)all year002
Iron, total [as Fe]daily maximumreport only (mg/L)all year002
Selenium, total [as Se]daily maximumreport only (ug/L)all year002
Flow, in conduit or thru treatment plantdaily maximum≤ 4 MGDall year002
Bromide [as Br]daily maximumreport only (mg/L)all year002
Mercury, total [as Hg]daily maximumreport only (ng/L)all year002
Pass/Fail Static Renewal 7 Day Chronic Ceriodaphnia dubiadaily maximumreport only (pass=0;fail=1)all year002
Temperature, water deg. centigradedaily maximumreport only (deg C)all year005
Conductivitydaily maximumreport only (umho/cm)all year005
pHdaily minimum≥ 6 SUall year005
pHdaily maximum≤ 9 SUall year005
Solids, total suspended30-day average≤ 30 mg/Lall year005
Solids, total suspendeddaily maximum≤ 50 mg/Lall year005
Oil & Grease30-day average≤ 15 mg/Lall year005
Oil & Greasedaily maximum≤ 20 mg/Lall year005
Arsenic, total [as As]daily maximumreport only (ug/L)all year005
Copper, total [as Cu]30-day average≤ 1 mg/Lall year005
Copper, total [as Cu]daily maximum≤ 1 mg/Lall year005
Iron, total [as Fe]30-day average≤ 1 mg/Lall year005
Iron, total [as Fe]daily maximum≤ 1 mg/Lall year005
Selenium, total [as Se]daily maximumreport only (ug/L)all year005
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year005
Mercury, total [as Hg]daily maximumreport only (ng/L)all year005
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year006
Oil & Grease30-day average≤ 15 mg/Lall year008
Oil & Greasedaily maximum≤ 20 mg/Lall year008

How strict are these limits?

Cited limits by parameter: North Carolina's rules and the federal ones.

Same industry: the 20 Electric Services permits in North Carolina.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/NC0004987 · MCP: https://passage-data.com/mcp