Passage Data · Check a report · Use it from your AI
Water Supply, Nokomis, Florida. NPDES permit FL0188859, in force until Jan 27, 2028. Last 12 months: over a limit 4 times (last March 2026), 101 required values missing, 1 of 24 reports late. Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| October 2025 | Oxygen, dissolved percent saturation, 90% of samples | 88 | ≤ 38 % | 132% |
| October 2025 | Oxygen, dissolved percent saturation, 90% of samples | 88 | ≤ 38 % | 132% |
| November 2025 | Oxygen, dissolved percent saturation, 90% of samples | 80 % | ≤ 38 % | 111% |
| March 2026 | Oxygen, dissolved percent saturation, 90% of samples | 88 | ≤ 38 % | 132% |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| Oxygen, dissolved percent saturation | 90% of samples | ≤ 38 % | all year |
| pH | daily minimum | ≥ 6 SU | all year |
| pH | daily maximum | ≤ 8.5 SU | all year |
| Solids, total suspended | daily maximum | report only (mg/L) | all year |
| Solids, total suspended | annual average | ≤ 5 mg/L | all year |
| Nitrogen, total [as N] | daily maximum | report only (mg/L) | all year |
| Nitrogen, total [as N] | annual average | ≤ 3 mg/L | all year |
| Phosphorus, total [as P] | daily maximum | report only (mg/L) | all year |
| Phosphorus, total [as P] | annual average | ≤ 1 mg/L | all year |
| Radium 226 + radium 228, total | daily maximum | report only (pCi/L) | all year |
| Radium 226 + radium 228, total | annual average | ≤ 5 pCi/L | all year |
| Flow, in conduit or thru treatment plant | daily maximum | report only (MGD) | all year |
| Flow, in conduit or thru treatment plant | monthly average | report only (MGD) | all year |
| Alpha, gross particle activity | maximum | report only (pCi/L) | all year |
| Alpha, gross particle activity | annual average | ≤ 15 pCi/L | all year |
| LC50 Static Renewal 96Hr Acute Ceriodaphnia dubia | minimum | ≥ 100 % | all year |
| LC50 Static Renewal 96Hr Acute Ceriodaphnia dubia | minimum | ≥ 100 % | all year |
| LC50 Static Renewal 96Hr Acute Ceriodaphnia dubia | minimum | ≥ 100 % | all year |
| LC50 Static Renewal 96Hr Acute Cyprinella leedsi | minimum | ≥ 100 % | all year |
| LC50 Static Renewal 96Hr Acute Cyprinella leedsi | minimum | ≥ 100 % | all year |
| LC50 Static Renewal 96Hr Acute Cyprinella leedsi | minimum | ≥ 100 % | all year |
Cited limits by parameter: Florida's rules and the federal ones.
Same industry: the 26 Water Supply permits in Florida.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/FL0188859 · MCP: https://passage-data.com/mcp