Passage Data · Check a report · Use it from your AI

Alpine Lake Public Utilities Company

Sporting And Recreational Camps, Terra Alta, West Virginia. NPDES permit WV0086665, in force until Oct 22, 2030. Last 12 months: over a limit 16 times (last August 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 25 days after each period: form A monthly (28 values), form C twice a year, form D yearly
Last report on file
August 2026
Oct 2024 – Sep 2025
10 values over a limit, 0 required values missing, 0 of 15 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

All 16 values over a limit
Period endingParameterReportedLimitOver by
December 2025BOD, 5-day, percent removal, monthly average minimum83.57 %≥ 85 %10%
December 2025Copper, total recoverable, monthly average.0086 mg/L≤ .006 mg/L43%
January 2026BOD, 5-day, percent removal, monthly average minimum83.56 %≥ 85 %10%
January 2026Solids, suspended percent removal, monthly average minimum79 %≥ 85 %40%
February 2026BOD, 5-day, 20 deg. C, monthly average16.3 lb/d≤ 12.5 lb/d30%
February 2026BOD, 5-day, 20 deg. C, monthly average17.3 mg/L≤ 10 mg/L73%
February 2026BOD, 5-day, percent removal, monthly average minimum57.28 %≥ 85 %185%
February 2026Coliform, fecal general, monthly geometric mean281 #/100mL≤ 200 #/100mL41%
February 2026Solids, suspended percent removal, monthly average minimum50 %≥ 85 %233%
March 2026BOD, 5-day, percent removal, monthly average minimum6 %≥ 85 %527%
March 2026Solids, suspended percent removal, monthly average minimum76.74 %≥ 85 %55%
April 2026Solids, suspended percent removal, monthly average minimum68.18 %≥ 85 %112%
May 2026BOD, 5-day, percent removal, monthly average minimum6 %≥ 85 %527%
June 2026BOD, 5-day, percent removal, monthly average minimum78.13 %≥ 85 %46%
June 2026Solids, suspended percent removal, monthly average minimum70 %≥ 85 %100%
August 2026Solids, suspended percent removal, monthly average minimum84.73 %≥ 85 %2%

Limits in force (32)

ParameterStatisticLimitMonths
Oxygen, dissolved [DO]instantaneous minimum≥ 6.5 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 10 mg/Lall year
BOD, 5-day, 20 deg. Cdaily maximum≤ 20 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 12.5 lb/dall year
BOD, 5-day, 20 deg. Cdaily maximum≤ 25 lb/dall year
pHinstantaneous minimum≥ 6 SUall year
pHinstantaneous maximum≤ 9 SUall year
Solids, total suspendedmonthly average≤ 30 mg/Lall year
Solids, total suspendeddaily maximum≤ 60 mg/Lall year
Solids, total suspendedmonthly average≤ 37.5 lb/dall year
Solids, total suspendeddaily maximum≤ 75 lb/dall year
Nitrogen, ammonia total [as N]monthly average≤ 2 mg/Lall year
Nitrogen, ammonia total [as N]daily maximum≤ 4 mg/Lall year
Nitrogen, ammonia total [as N]monthly average≤ 2.5 lb/dall year
Nitrogen, ammonia total [as N]daily maximum≤ 5 lb/dall year
Hardness, total [as CaCO3]monthly averagereport only (mg/L)all year
Hardness, total [as CaCO3]daily maximumreport only (mg/L)all year
Zinc, total recoverablemonthly average≤ .038 mg/Lall year
Zinc, total recoverabledaily maximum≤ .087 mg/Lall year
Lead, total recoverablemonthly averagereport only (mg/L)all year
Lead, total recoverabledaily maximumreport only (mg/L)all year
Copper, total recoverablemonthly average≤ .006 mg/Lall year
Copper, total recoverabledaily maximum≤ .01 mg/Lall year
Flow, in conduit or thru treatment plantminimumreport only (MGD)all year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Chlorine, total residualmonthly average≤ 0 mg/Lall year
Chlorine, total residualdaily maximum≤ 0 mg/Lall year
Coliform, fecal generalmonthly geometric mean≤ 200 #/100mLall year
Coliform, fecal generaldaily maximum≤ 400 #/100mLall year
BOD, 5-day, percent removalmonthly average minimum≥ 85 %all year
Solids, suspended percent removalmonthly average minimum≥ 85 %all year

How strict are these limits?

Cited limits by parameter: West Virginia's rules and the federal ones.

Same industry: the 8 Hotels, Rooming Houses, Camps and Other Lodging permits in West Virginia.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/WV0086665 · MCP: https://passage-data.com/mcp