Passage Data · Check a report · Use it from your AI

Fort Gay, Town of

Sewage treatment plant, Fort Gay, West Virginia. NPDES permit WV0085359, in force until Dec 27, 2027. Last 12 months: over a limit 18 times (last August 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 25 days after each period: form A monthly (22 values), form B quarterly (8 values)
Renewal application due
Jun 30, 2027 · 180 days before expiry; your permit may set another date
Last report on file
August 2026
Oct 2024 – Sep 2025
61 values over a limit, 22 required values missing, 2 of 16 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

All 18 values over a limit
Period endingParameterReportedLimitOver by
October 2025BOD, 5-day, percent removal, monthly average minimum53 %≥ 85 %213%
October 2025Solids, suspended percent removal, monthly average minimum82.8 %≥ 85 %15%
October 2025Solids, total suspended, monthly average25.22 lb/d≤ 23 lb/d10%
November 2025BOD, 5-day, percent removal, monthly average minimum73 %≥ 85 %80%
December 2025Coliform, fecal general, daily maximum2420 #/100mL≤ 400 #/100mL505%
December 2025Coliform, fecal general, monthly geometric mean2420 #/100mL≤ 200 #/100mL1110%
January 2026BOD, 5-day, percent removal, monthly average minimum69.2 %≥ 85 %105%
February 2026BOD, 5-day, percent removal, monthly average minimum63.3 %≥ 85 %145%
March 2026Nitrogen, ammonia total [as N], monthly average13.7 mg/L≤ 13.1 mg/L5%
April 2026BOD, 5-day, percent removal, monthly average minimum84 %≥ 85 %7%
May 2026BOD, 5-day, percent removal, monthly average minimum51.5 %≥ 85 %223%
May 2026Coliform, fecal general, daily maximum60000 #/100mL≤ 400 #/100mL14900%
May 2026Solids, suspended percent removal, monthly average minimum60 %≥ 85 %167%
June 2026Solids, suspended percent removal, monthly average minimum63 %≥ 85 %147%
July 2026BOD, 5-day, percent removal, monthly average minimum79 %≥ 85 %40%
July 2026Solids, suspended percent removal, monthly average minimum62 %≥ 85 %153%
August 2026BOD, 5-day, percent removal, monthly average minimum7 %≥ 85 %520%
August 2026Solids, suspended percent removal, monthly average minimum21 %≥ 85 %427%

Limits in force (30)

ParameterStatisticLimitMonths
BOD, 5-day, 20 deg. Cmonthly average≤ 30 mg/Lall year
BOD, 5-day, 20 deg. Cdaily maximum≤ 60 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 23 lb/dall year
BOD, 5-day, 20 deg. Cdaily maximum≤ 46 lb/dall year
pHinstantaneous minimum≥ 6 SUall year
pHinstantaneous maximum≤ 9 SUall year
Solids, total suspendedmonthly average≤ 30 mg/Lall year
Solids, total suspendeddaily maximum≤ 60 mg/Lall year
Solids, total suspendedmonthly average≤ 23 lb/dall year
Solids, total suspendeddaily maximum≤ 46 lb/dall year
Nitrogen, ammonia total [as N]monthly average≤ 13.1 mg/Lall year
Nitrogen, ammonia total [as N]daily maximum≤ 26.2 mg/Lall year
Nitrogen, ammonia total [as N]monthly average≤ 10.1 lb/dall year
Nitrogen, ammonia total [as N]daily maximum≤ 20.1 lb/dall year
Iron, total recoverablemonthly averagereport only (mg/L)all year
Iron, total recoverabledaily maximumreport only (mg/L)all year
Zinc, total recoverablemonthly averagereport only (mg/L)all year
Zinc, total recoverabledaily maximumreport only (mg/L)all year
Lead, total recoverablemonthly averagereport only (mg/L)all year
Lead, total recoverabledaily maximumreport only (mg/L)all year
Copper, total recoverablemonthly averagereport only (mg/L)all year
Copper, total recoverabledaily maximumreport only (mg/L)all year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Chlorine, total residualmonthly average≤ .028 mg/Lall year
Chlorine, total residualdaily maximum≤ .057 mg/Lall year
Coliform, fecal generalmonthly geometric mean≤ 200 #/100mLall year
Coliform, fecal generaldaily maximum≤ 400 #/100mLall year
BOD, 5-day, percent removalmonthly average minimum≥ 85 %all year
Solids, suspended percent removalmonthly average minimum≥ 85 %all year

How strict are these limits?

Cited limits by parameter: West Virginia's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/WV0085359 · MCP: https://passage-data.com/mcp