Passage Data · Check a report · Use it from your AI

Wisconsin Electric Power Company Germantown

Electric Services, Germantown, Wisconsin. NPDES permit WI0042757 expired Jun 30, 2022; its limits still apply. Last 12 months: no values over a limit, 16 required values missing. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: form Q quarterly (6 values)
Last report on file
June 2026
Oct 2024 – Sep 2025
0 values over a limit, 21 required values missing, 0 of 5 reports late

Limits in force (7)

ParameterStatisticLimitMonthsOutfall
Solids, total suspendedquarterly averagereport only (mg/L)all year001
Solids, total suspendedquarterly maximumreport only (mg/L)all year001
Oil and grease, hexane extr methodmonthly average≤ 15 mg/Lall year001
Phosphorus, total [as P]quarterly maximumreport only (mg/L)all year001
Flow, in conduit or thru treatment plantquarterly averagereport only (gal/d)all year001
Flow, in conduit or thru treatment plantquarterly maximumreport only (gal/d)all year001
Solids, total suspendeddaily maximum≤ 40 mg/LDec003

How strict are these limits?

Cited limits by parameter: Wisconsin's rules and the federal ones.

Same industry: the 17 Electric Services permits in Wisconsin.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/WI0042757 · MCP: https://passage-data.com/mcp