Passage Data · Check a report · Use it from your AI

Potosi-Tennyson Sewage Commission

Sewage treatment plant, Potosi, Wisconsin. NPDES permit WI0021547 expired Dec 31, 2023; its limits still apply. Last 12 months: over a limit once (last October 2025), 42 required values missing, 4 of 22 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: outfall 001 form A monthly (15 values), outfall 701 form A monthly (4 values)
Last report on file
June 2026
Oct 2024 – Sep 2025
9 values over a limit, 8 required values missing, 6 of 24 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
October 2025Phosphorus, total [as P], monthly average4.0053≤ 2.8 mg/L43%

Limits in force (19)

ParameterStatisticLimitMonthsOutfall
Oxygen, dissolved [DO]daily minimum≥ 4 mg/Lall year001
BOD, 5-day, 20 deg. Cweekly average≤ 30 mg/Lall year001
BOD, 5-day, 20 deg. Cmonthly average≤ 20 mg/Lall year001
pHdaily minimum≥ 6 SUall year001
pHdaily maximum≤ 9 SUall year001
Solids, total suspendedweekly average≤ 30 mg/Lall year001
Solids, total suspendedmonthly average≤ 20 mg/Lall year001
Nitrogen, ammonia total [as N]weekly average≤ 35 mg/Lall year001
Nitrogen, ammonia total [as N]monthly average≤ 15 mg/Lall year001
Phosphorus, total [as P]monthly average≤ 2.8 mg/Lall year001
Phosphorus, total [as P]monthly averagereport only (lb/d)all year001
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year001
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year001
Coliform, fecal generalweekly geometric mean≤ 656 #/100mLMay–Sep001
Coliform, fecal generalgeometric mean≤ 400 #/100mLMay–Sep001
BOD, 5-day, 20 deg. Cmonthly averagereport only (mg/L)all year701
BOD, 5-day, 20 deg. Cdaily maximumreport only (mg/L)all year701
Solids, total suspendedmonthly averagereport only (mg/L)all year701
Solids, total suspendeddaily maximumreport only (mg/L)all year701

How strict are these limits?

Cited limits by parameter: Wisconsin's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/WI0021547 · MCP: https://passage-data.com/mcp