Passage Data · Check a report · Use it from your AI
Sewage treatment plant, Grand Coulee, Washington. NPDES permit WA0044857 expired Dec 31, 2014; its limits still apply. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.
| Parameter | Statistic | Limit | Months | Outfall |
|---|---|---|---|---|
| Temperature, water deg. centigrade | daily maximum | report only (deg C) (alert, not enforceable) | all year | 001 |
| Oxygen, dissolved [DO] | maximum | report only (mg/L) | all year | 001 |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 30 mg/L | all year | 001 |
| BOD, 5-day, 20 deg. C | weekly average | ≤ 45 mg/L | all year | 001 |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 75 lb/d | all year | 001 |
| BOD, 5-day, 20 deg. C | weekly average | ≤ 112 lb/d | all year | 001 |
| pH | daily minimum | ≥ 6.5 SU | all year | 001 |
| pH | daily maximum | ≤ 8.5 SU | all year | 001 |
| Solids, total suspended | monthly average | ≤ 30 mg/L | all year | 001 |
| Solids, total suspended | weekly average | ≤ 45 mg/L | all year | 001 |
| Solids, total suspended | monthly average | ≤ 75 lb/d | all year | 001 |
| Solids, total suspended | weekly average | ≤ 112 lb/d | all year | 001 |
| Nitrite + Nitrate total [as N] | maximum | report only (mg/L) | all year | 001 |
| Nitrogen, inorganic total | maximum | report only (mg/L) | all year | 001 |
| Phosphorus, total [as P] | maximum | report only (mg/L) | all year | 001 |
| Chlorine, total residual | average | report only (mg/L) | all year | 001 |
| Chlorine, total residual | maximum | report only (mg/L) | all year | 001 |
| BOD, percent removal [total] | monthly average minimum | ≥ 85 % | all year | 001 |
| Coliform, fecal general | monthly average | ≤ 100 #/100mL | all year | 001 |
| Coliform, fecal general | weekly average | ≤ 200 #/100mL | all year | 001 |
| Solids, suspended percent removal | monthly average minimum | ≥ 85 % | all year | 001 |
| BOD, 5-day, 20 deg. C | average | report only (mg/L) | all year | IN1 |
| BOD, 5-day, 20 deg. C | maximum | report only (mg/L) | all year | IN1 |
| BOD, 5-day, 20 deg. C | daily maximum | report only (lb/d) | all year | IN1 |
| BOD, 5-day, 20 deg. C | monthly average | report only (lb/d) | all year | IN1 |
| Solids, total suspended | average | report only (mg/L) | all year | IN1 |
| Solids, total suspended | maximum | report only (mg/L) | all year | IN1 |
| Solids, total suspended | daily maximum | report only (lb/d) | all year | IN1 |
| Solids, total suspended | monthly average | report only (lb/d) | all year | IN1 |
| Flow | average | report only (MGD) | all year | IN1 |
| Flow | maximum | report only (MGD) | all year | IN1 |
Cited limits by parameter: Washington's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/WA0044857 · MCP: https://passage-data.com/mcp