Passage Data · Check a report · Use it from your AI

Tidewater Barge Lines/Tidewater Terminal Company

Ship Building And Repairing, Vancouver, Washington. NPDES permit WA0038776, in force until Dec 31, 2030. Last 12 months: no values over a limit, 7 required values missing. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: outfall 0000 form MM monthly (1 value), outfall 001 form MM monthly (10 values), outfall 001A form MM monthly (1 value), outfall 001A form QQ quarterly (9 values), outfall 002 form QQ quarterly (14 values)
Last report on file
September 2026
Oct 2024 – Sep 2025
1 value over a limit, 0 required values missing, 0 of 36 reports late

Limits in force (35)

ParameterStatisticLimitMonthsOutfall
Turbidity, increase over backgroundmaximum≤ 5 NTUall year0000
Turbiditydaily maximumreport only (NTU) (alert, not enforceable)all year001
pHmaximum≤ 8.5 SUall year001
pHminimum≥ 6.5 SUall year001
Solids, total suspendeddaily maximum≤ 10 mg/Lall year001
Oil and grease, hexane extr methoddaily maximum≤ 5 mg/Lall year001
Copper, total [as Cu]daily maximum≤ 10.5 ug/Lall year001
Copper, total [as Cu]monthly average≤ 7.3 ug/Lall year001
Lead, total [as Pb]daily maximumreport only (ug/L) (alert, not enforceable)all year001
Zinc, total [as Zn]daily maximum≤ 74 ug/Lall year001
Oil and grease visualdaily maximumreport only (N=0;Y=1) (alert, not enforceable)all year001
Tide stagedaily maximumreport only (ft) (alert, not enforceable)all year001A
pHsingle readingreport only (SU) (alert, not enforceable)all year001A
Solids, total suspendedsingle readingreport only (mg/L) (alert, not enforceable)all year001A
Copper, total [as Cu]single readingreport only (ug/L) (alert, not enforceable)all year001A
Lead, total [as Pb]single readingreport only (ug/L) (alert, not enforceable)all year001A
Zinc, total [as Zn]single readingreport only (ug/L) (alert, not enforceable)all year001A
Time of Sample Collectiondaily maximumreport only (time) (alert, not enforceable)all year001A
DMR Attachment Requireddaily maximumreport only (N=0;Y=1) (alert, not enforceable)all year001A
Turbidity, backgrounddaily maximumreport only (NTU) (alert, not enforceable)all year001A
Outfall observation,visual, y/n responsedaily maximumreport only (N=0;Y=1) (alert, not enforceable)all year001A
Tide stagedaily maximumreport only (ft) (alert, not enforceable)all year002
Turbiditydaily maximumreport only (NTU) (alert, not enforceable)all year002
pHmaximum≤ 8.5 SUall year002
pHminimum≥ 6.5 SUall year002
Solids, total suspendeddaily maximum≤ 10 mg/Lall year002
Oil and grease, hexane extr methoddaily maximum≤ 5 mg/Lall year002
Copper, total [as Cu]daily maximum≤ 76 ug/L (alert, not enforceable)all year002
Lead, total [as Pb]daily maximumreport only (ug/L) (alert, not enforceable)all year002
Zinc, total [as Zn]daily maximum≤ 48 ug/L (alert, not enforceable)all year002
Time of Sample Collectiondaily maximumreport only (time) (alert, not enforceable)all year002
DMR Attachment Requireddaily maximumreport only (N=0;Y=1) (alert, not enforceable)all year002
Turbidity, backgrounddaily maximumreport only (NTU) (alert, not enforceable)all year002
Oil and grease visualdaily maximum≤ 0 N=0;Y=1all year002
Outfall observation,visual, y/n responsedaily maximumreport only (N=0;Y=1) (alert, not enforceable)all year002

How strict are these limits?

Cited limits by parameter: Washington's rules and the federal ones.

Same industry: the 13 Transportation Equipment permits in Washington.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/WA0038776 · MCP: https://passage-data.com/mcp