NPDES permit WA0037141 · Minor POTW · administratively continued, expires 2016-10-30 · EPA's file as of 2026-09-19
Check this month's numbers before you fileLast period with anything received: 2026-08-31.
Reports are due about 15 days after each monitoring period ends (the most common figure among WA permits in EPA's filings — check your permit).
| Outfall | Parameter | Statistic | Limit | Months |
|---|---|---|---|---|
| 001 | BOD, 5-day, 20 deg. C | AVERAGE | <= 20 lb/d | all year |
| 001 | BOD, 5-day, 20 deg. C | WKLY AVG | <= 30 lb/d | all year |
| 001 | Solids, total suspended | AVERAGE | <= 20 lb/d | all year |
| 001 | Solids, total suspended | WKLY AVG | <= 30 lb/d | all year |
| INF | BOD, 5-day, 20 deg. C | AVERAGE | report only (alert) | all year |
| INF | BOD, 5-day, 20 deg. C | MAXIMUM | report only (alert) | all year |
| INF | Solids, total suspended | AVERAGE | report only (alert) | all year |
| INF | Solids, total suspended | MAXIMUM | report only (alert) | all year |
Built from EPA's ECHO bulk files. EPA's file, not the permit document, is the source: read your permit. Check a report before you file it · All states