Passage Data · Check a report · Use it from your AI

Mcnary Lock and Dam - Usace

Federal facility (Electric Services), Umatilla, Washington. NPDES permit WA0026824, in force until Jun 30, 2028. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 20 days after each period: outfall 021 form A monthly (7 values), outfall 022 form A monthly (7 values), outfall SUM form A monthly (1 value)
Renewal application due
Jan 2, 2028 · 180 days before expiry; your permit may set another date
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 2 required values missing, 6 of 36 reports late

Limits in force (15)

ParameterStatisticLimitMonthsOutfall
pHinstantaneous minimum≥ 7 SUall year021
pHinstantaneous maximum≤ 8.5 SUall year021
pHinstantaneous minimum≥ 7 SUall year021
pHinstantaneous maximum≤ 8.5 SUall year021
Oil & Greasedaily maximum≤ 5 mg/Lall year021
Oil & Greasedaily maximum≤ 5 mg/Lall year021
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year021
pHinstantaneous minimum≥ 7 SUall year022
pHinstantaneous maximum≤ 8.5 SUall year022
pHinstantaneous minimum≥ 7 SUall year022
pHinstantaneous maximum≤ 8.5 SUall year022
Oil & Greasedaily maximum≤ 5 mg/Lall year022
Oil & Greasedaily maximum≤ 5 mg/Lall year022
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year022
Oil and grease visualinstantaneous maximumreport only (N=0;Y=1)all yearSUM

How strict are these limits?

Cited limits by parameter: Washington's rules and the federal ones.

Same industry: the 21 Electric Services permits in Washington.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/WA0026824 · MCP: https://passage-data.com/mcp