Passage Data · Check a report · Use it from your AI
Sewage treatment plant, Ferndale, Washington. NPDES permit WA0025658 expired Nov 30, 2016; its limits still apply. Last 12 months: over a limit 2 times (last August 2026), 10 of 16 reports late. Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| August 2026 | Solids, suspended percent removal, monthly average minimum | 74 % | ≥ 85 % | 73% |
| August 2026 | Solids, total suspended, weekly average | 66 mg/L | ≤ 45 mg/L | 47% |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| BOD, 5-day, 20 deg. C | monthly average | ≤ 30 mg/L | all year |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 63 lb/d | all year |
| BOD, 5-day, 20 deg. C | monthly average | report only (mg/L) | all year |
| BOD, 5-day, 20 deg. C | weekly average | ≤ 45 mg/L | all year |
| BOD, 5-day, 20 deg. C | weekly average | ≤ 94 lb/d | all year |
| pH | instantaneous minimum | ≥ 6 SU | all year |
| pH | instantaneous maximum | ≤ 9 SU | all year |
| Solids, total suspended | monthly average | ≤ 30 mg/L | all year |
| Solids, total suspended | monthly average | ≤ 63 lb/d | all year |
| Solids, total suspended | monthly average | report only (mg/L) | all year |
| Solids, total suspended | weekly average | ≤ 45 mg/L | all year |
| Solids, total suspended | weekly average | ≤ 94 lb/d | all year |
| Nitrogen, ammonia total [as N] | quarterly maximum | report only (mg/L) | all year |
| Nitrogen, Kjeldahl, total [as N] | quarterly maximum | report only (mg/L) | all year |
| Nitrite + Nitrate total [as N] | quarterly maximum | report only (mg/L) | all year |
| Fecal coliform, MPN, EC med, 44.5 C | monthly geometric mean | ≤ 200 #/100mL | all year |
| Fecal coliform, MPN, EC med, 44.5 C | weekly geometric mean | ≤ 400 #/100mL | all year |
| Floating solids, waste or visible foam-visual | monthly maximum | ≤ 0 N=0;Y=1 | all year |
| Flow, in conduit or thru treatment plant | monthly average | report only (MGD) | all year |
| Flow, in conduit or thru treatment plant | monthly maximum | report only (MGD) | all year |
| Chlorine, total residual | monthly average | ≤ .23 mg/L | all year |
| Chlorine, total residual | daily maximum | ≤ .65 mg/L | all year |
| BOD, 5-day, percent removal | monthly average minimum | ≥ 85 % | all year |
| Solids, suspended percent removal | monthly average minimum | ≥ 85 % | all year |
| Oil and grease visual | monthly maximum | ≤ 0 N=0;Y=1 | all year |
Cited limits by parameter: Washington's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/WA0025658 · MCP: https://passage-data.com/mcp