Passage Data · Check a report · Use it from your AI
Industrial or other facility, Georgia, Vermont. NPDES permit VT0020702 expired Jun 30, 2023; its limits still apply. Last 12 months: over a limit 3 times (last January 2026), 14 required values missing. Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| January 2026 | BOD, 5-day, 20 deg. C, daily maximum | 20.2 | ≤ 15 mg/L | 35% |
| January 2026 | BOD, 5-day, 20 deg. C, monthly average | 12.61 | ≤ 10 mg/L | 26% |
| January 2026 | Solids, total suspended, daily maximum | 20.2 | ≤ 15 mg/L | 35% |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| Oxygen demand, ultimate | monthly average | ≤ 83 lb/d | Jun–Sep |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 10 mg/L | all year |
| BOD, 5-day, 20 deg. C | daily maximum | ≤ 15 mg/L | all year |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 35 lb/d | all year |
| BOD, 5-day, 20 deg. C | daily maximum | ≤ 57 lb/d | all year |
| pH | minimum | ≥ 6.5 SU | all year |
| pH | maximum | ≤ 8.5 SU | all year |
| Solids, total suspended | monthly average | ≤ 10 mg/L | all year |
| Solids, total suspended | daily maximum | ≤ 15 mg/L | all year |
| Solids, total suspended | monthly average | ≤ 35 lb/d | all year |
| Solids, total suspended | daily maximum | ≤ 57 lb/d | all year |
| Solids, settleable | instantaneous maximum | ≤ 1 mL/L | all year |
| Phosphorus, total [as P] | monthly average | ≤ .8 mg/L | all year |
| Phosphorus, total [as P] | annual total | ≤ 776 lb/yr | Dec |
| Flow, in conduit or thru treatment plant | daily maximum | ≤ .46 MGD | all year |
| Flow, in conduit or thru treatment plant | annual average | ≤ .425 MGD | Dec |
Cited limits by parameter: Vermont's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/VT0020702 · MCP: https://passage-data.com/mcp