RED RIVER COAL COMPANY, INC.

NPDES permit VAM081272 · Minor NON-POTW · administratively continued, expired 2025-06-21 · EPA's file as of 2026-09-26

Keep this permit as a site — opens New site at EPA's facility point (37.05872, -82.7198); you set the radius.

Check this month's numbers before you file
Watch this permit — $79 a month. Every Monday, from EPA's newest files: the next report due and when, whether EPA's file holds your last one, any change to this permit's limits or status, and the renewal date.

These are the last limits EPA's file holds for this permit, from an earlier version of it (version 0 in EPA's file): its current version carries none yet. Read your permit: a renewal can change them.

EPA's record, 2025-09-01 to 2026-08-31

0values over a limit
13required values missing, on 1 form(s)
0of 2 forms filed late

Last period with anything received: 2025-09-30.

Reporting

Reports are due about 10 days after each monitoring period ends (the most common figure among VA permits in EPA's filings — check your permit).

How strict are these limits?

Each concentration limit against the same limit in comparable permits. Where it appears more than once, its strictest value.

Limits in force (13)

OutfallParameterStatisticLimitMonths
1737pHinstantaneous minimum >= 6 SU all year
1737pHinstantaneous maximum <= 9 SU all year
1737Solids, total suspendeddaily minimum report only all year
1737Solids, total suspendedmonthly average <= 35 mg/L all year
1737Solids, total suspendeddaily maximum <= 70 mg/L all year
1737Iron, total [as Fe]daily minimum report only all year
1737Iron, total [as Fe]monthly average <= 3 mg/L all year
1737Iron, total [as Fe]daily maximum <= 6 mg/L all year
1737Manganese, total [as Mn]daily minimum report only all year
1737Manganese, total [as Mn]monthly average <= 2 mg/L all year
1737Manganese, total [as Mn]daily maximum <= 4 mg/L all year
1737Flow, in conduit or thru treatment plantmonthly average report only all year
1737Flow, in conduit or thru treatment plantdaily maximum report only all year

Built from EPA's ECHO bulk files. EPA's file, not the permit document, is the source: read your permit. Check a report before you file it · All states