Passage Data · Check a report · Use it from your AI

L.B.H., L.L.C.

Sewerage Systems, Chesapeake, Virginia. NPDES permit VA0091758, in force until May 31, 2029. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 10 days after each period: form M1 monthly (25 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
1 value over a limit, 0 required values missing, 0 of 12 reports late

Limits in force (25)

ParameterStatisticLimitMonths
Oxygen, dissolved [DO]minimum≥ 4 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 10 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly maximum≤ 15 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ .15 kg/dall year
BOD, 5-day, 20 deg. Cmaximum≤ .23 kg/dall year
pHminimum≥ 6 SUall year
pHmaximum≤ 9 SUall year
Solids, total suspendedmonthly average≤ 10 mg/Lall year
Solids, total suspendedmonthly maximum≤ 15 mg/Lall year
Solids, total suspendedmonthly average≤ .15 kg/dall year
Solids, total suspendedmaximum≤ .23 kg/dall year
Nitrogen, total [as N]monthly averagereport only (mg/L)all year
Nitrogen, total [as N]maximumreport only (kg/d)all year
Nitrogen, Kjeldahl, total [as N]monthly average≤ 3 mg/Lall year
Nitrogen, Kjeldahl, total [as N]monthly maximum≤ 4.5 mg/Lall year
Nitrogen, Kjeldahl, total [as N]monthly average≤ .04 kg/dall year
Nitrogen, Kjeldahl, total [as N]maximum≤ .07 kg/dall year
Phosphorus, total [as P]monthly averagereport only (mg/L)all year
Phosphorus, total [as P]maximumreport only (kg/d)all year
Flow, in conduit or thru treatment plantmonthly average≤ .004 MGD (alert, not enforceable)all year
Flow, in conduit or thru treatment plantmaximumreport only (MGD) (alert, not enforceable)all year
Chlorine, total residualmonthly average≤ .008 mg/Lall year
Chlorine, total residualweekly average≤ .01 mg/Lall year
E. coligeometric mean≤ 126 #/100mLall year
E. colimonthly maximum≤ 235 #/100mLall year

How strict are these limits?

Cited limits by parameter: Virginia's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/VA0091758 · MCP: https://passage-data.com/mcp