Passage Data · Check a report · Use it from your AI

Caroline Furnace Lutheran Camp and Retreat Center, Inc.

Sewerage Systems, Fort Valley, Virginia. NPDES permit VA0090051, in force until Oct 31, 2028. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 10 days after each period: form M1 monthly (18 values), form A1 yearly
Last report on file
August 2026
Oct 2024 – Sep 2025
1 value over a limit, 0 required values missing, 0 of 13 reports late

Limits in force (23)

ParameterStatisticLimitMonths
Oxygen, dissolved [DO]minimum≥ 5 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 30 mg/Lall year
BOD, 5-day, 20 deg. Cweekly average≤ 45 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 1.1 kg/dall year
BOD, 5-day, 20 deg. Cmaximum weekly average≤ 1.7 kg/dall year
BOD, 5-day, 20 deg. Cmonthly averagereport only (mg/L)all year
pHminimum≥ 6.5 SUall year
pHmaximum≤ 9 SUall year
Solids, total suspendedmonthly average≤ 30 mg/Lall year
Solids, total suspendedweekly average≤ 45 mg/Lall year
Solids, total suspendedmonthly average≤ 1.1 kg/dall year
Solids, total suspendedweekly average≤ 1.7 kg/dall year
Solids, total suspendedmonthly averagereport only (mg/L)all year
Nitrogen, ammonia total [as N]monthly average≤ 16 mg/Lall year
Nitrogen, ammonia total [as N]weekly average≤ 16 mg/Lall year
Flow, in conduit or thru treatment plantmonthly average≤ .01 MGD (alert, not enforceable)all year
Flow, in conduit or thru treatment plantmaximum weekly averagereport only (MGD) (alert, not enforceable)all year
Chlorine, total residualmonthly average≤ .028 mg/Lall year
Chlorine, total residualweekly average≤ .034 mg/Lall year
Chlorine, total residualminimum≥ .6 mg/Lall year
BOD, percent removal [total]monthly average minimum≥ 85 %all year
E. colimonthly geometric mean≤ 126 #/100mLall year
Solids, suspended percent removalmonthly average minimum≥ 85 %all year

How strict are these limits?

Cited limits by parameter: Virginia's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/VA0090051 · MCP: https://passage-data.com/mcp