Passage Data · Check a report · Use it from your AI
Sewage treatment plant, Glasgow, Virginia. NPDES permit VA0083712, in force until Feb 28, 2030. Last 12 months: over a limit 6 times (last July 2026), 4 required values missing. Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| October 2025 | Chlorine, total residual, instantaneous minimum | .2 | ≥ .6 mg/L | 67% |
| January 2026 | Chlorine, total residual, monthly average | 1.18 | ≤ 1.1 mg/L | 7% |
| January 2026 | Chlorine, total residual, maximum weekly average | 1.21 | ≤ 1.2 mg/L | 1% |
| March 2026 | Chlorine, total residual, monthly average | 1.16 | ≤ 1.1 mg/L | 5% |
| May 2026 | Chlorine, total residual, monthly average | 1.11 | ≤ 1.1 mg/L | 1% |
| July 2026 | Chlorine, total residual, monthly average | 1.12 | ≤ 1.1 mg/L | 2% |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| BOD, 5-day, 20 deg. C | monthly average | ≤ 30 mg/L | all year |
| BOD, 5-day, 20 deg. C | maximum weekly average | ≤ 45 mg/L | all year |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 56 kg/d | all year |
| BOD, 5-day, 20 deg. C | maximum weekly average | ≤ 84 kg/d | all year |
| BOD, 5-day, 20 deg. C | monthly average | report only (mg/L) | all year |
| pH | minimum | ≥ 6 SU | all year |
| pH | maximum | ≤ 9 SU | all year |
| Solids, total suspended | monthly average | ≤ 30 mg/L | all year |
| Solids, total suspended | maximum weekly average | ≤ 45 mg/L | all year |
| Solids, total suspended | monthly average | ≤ 56 kg/d | all year |
| Solids, total suspended | maximum weekly average | ≤ 84 kg/d | all year |
| Solids, total suspended | monthly average | report only (mg/L) | all year |
| Flow, in conduit or thru treatment plant | monthly average | ≤ .495 MGD (alert, not enforceable) | all year |
| Flow, in conduit or thru treatment plant | monthly maximum | report only (MGD) (alert, not enforceable) | all year |
| Chlorine, total residual | monthly average | ≤ 1.1 mg/L | all year |
| Chlorine, total residual | maximum weekly average | ≤ 1.2 mg/L | all year |
| Chlorine, total residual | instantaneous minimum | ≥ .6 mg/L | all year |
| BOD, percent removal [total] | monthly average minimum | ≥ 85 % | all year |
| E. coli | geometric mean | ≤ 126 #/100mL | all year |
| Solids, suspended percent removal | monthly average minimum | ≥ 85 % | all year |
Cited limits by parameter: Virginia's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/VA0083712 · MCP: https://passage-data.com/mcp