Passage Data · Check a report · Use it from your AI
Sewerage Systems, major discharger, Suffolk, Virginia. NPDES permit VA0081299 expired Feb 29, 2024; its limits still apply. Last 12 months: no values over a limit, 1 of 12 reports late. Source: EPA ECHO, Oct 22, 2026.
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| BOD, 5-day, 20 deg. C | monthly average | ≤ 30 mg/L | all year |
| BOD, 5-day, 20 deg. C | weekly average | ≤ 45 mg/L | all year |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 3406 kg/d | all year |
| BOD, 5-day, 20 deg. C | weekly average | ≤ 5110 kg/d | all year |
| pH | minimum | ≥ 6 SU | all year |
| pH | maximum | ≤ 9 SU | all year |
| Solids, total suspended | monthly average | ≤ 30 mg/L | all year |
| Solids, total suspended | weekly average | ≤ 45 mg/L | all year |
| Solids, total suspended | monthly average | ≤ 3406 kg/d | all year |
| Solids, total suspended | weekly average | ≤ 5110 kg/d | all year |
| Nitrogen, total [as N] | monthly average | report only (mg/L) | all year |
| Nitrogen, total [as N] | annual average | ≤ 8 mg/L | all year |
| Phosphorus, total [as P] | monthly average | report only (mg/L) | all year |
| Phosphorus, total [as P] | annual average | ≤ 2 mg/L | all year |
| Flow, in conduit or thru treatment plant | monthly average | ≤ 30 MGD (alert, not enforceable) | all year |
| Flow, in conduit or thru treatment plant | maximum | report only (MGD) (alert, not enforceable) | all year |
| Chlorine, total residual | monthly average | ≤ .2 mg/L | all year |
| Chlorine, total residual | weekly average | ≤ 2.4 mg/L | all year |
| Enterococci | geometric mean | ≤ 35 #/100mL | all year |
| Coliform, fecal general | geometric mean | ≤ 200 #/100mL | all year |
Cited limits by parameter: Virginia's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/VA0081299 · MCP: https://passage-data.com/mcp