Passage Data · Check a report · Use it from your AI

Scottsburg Town

Sewage treatment plant, Scottsburg, Virginia. NPDES permit VA0062103, in force until Feb 28, 2031. Last 12 months: over a limit 3 times (last August 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 10 days after each period: form M1 monthly (16 values), form A1 yearly
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 12 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
February 2026BOD, 5-day, 20 deg. C, monthly average11≤ 3.4 kg/d224%
February 2026BOD, 5-day, 20 deg. C, maximum weekly average11≤ 5.1 kg/d116%
August 2026BOD, 5-day, 20 deg. C, maximum weekly average46≤ 45 mg/L2%

Limits in force (21)

ParameterStatisticLimitMonths
Oxygen, dissolved [DO]daily minimum≥ 6.5 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 30 mg/Lall year
BOD, 5-day, 20 deg. Cmaximum weekly average≤ 45 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 3.4 kg/dall year
BOD, 5-day, 20 deg. Cmaximum weekly average≤ 5.1 kg/dall year
BOD, 5-day, 20 deg. Cmonthly averagereport only (mg/L)all year
pHdaily minimum≥ 6 SUall year
pHdaily maximum≤ 9 SUall year
Solids, total suspendedmonthly average≤ 30 mg/Lall year
Solids, total suspendedmaximum weekly average≤ 45 mg/Lall year
Solids, total suspendedmonthly average≤ 3.4 kg/dall year
Solids, total suspendedmaximum weekly average≤ 5.1 kg/dall year
Solids, total suspendedmonthly averagereport only (mg/L)all year
Flow, in conduit or thru treatment plantdaily average≤ .03 MGD (alert, not enforceable)all year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD) (alert, not enforceable)all year
Chlorine, total residualmonthly average≤ .19 mg/Lall year
Chlorine, total residualmaximum weekly average≤ .23 mg/Lall year
Chlorine, total residualinstantaneous minimum≥ .6 mg/Lall year
BOD, percent removal [total]monthly average minimum≥ 85 %all year
E. coli30-day geometric mean≤ 126 #/100mLall year
Solids, suspended percent removalmonthly average minimum≥ 85 %all year

How strict are these limits?

Cited limits by parameter: Virginia's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/VA0062103 · MCP: https://passage-data.com/mcp