Passage Data · Check a report · Use it from your AI

Lynchburg City

Sewage treatment plant, major discharger, Lynchburg, Virginia. NPDES permit VA0024970, in force until Nov 30, 2030. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 10 days after each period: outfall 001 form M1 monthly (6 values), outfall 101 form M1 monthly (16 values), outfall 102 form M1 monthly (5 values), outfall 101 form Q1 quarterly
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 12 reports late

Limits in force (31)

ParameterStatisticLimitMonthsOutfall
pHinstantaneous minimum≥ 6 SUall year001
pHinstantaneous maximum≤ 9 SUall year001
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD) (alert, not enforceable)all year001
Flow, in conduit or thru treatment plantmaximum weekly averagereport only (MGD) (alert, not enforceable)all year001
Chlorine, total residualmonthly average≤ 19 ug/Lall year001
Chlorine, total residualmaximum weekly average≤ 23 ug/Lall year001
BOD, 5-day, 20 deg. Cmonthly average≤ 30 mg/Lall year101
BOD, 5-day, 20 deg. Cmaximum weekly average≤ 45 mg/Lall year101
BOD, 5-day, 20 deg. Cmonthly average≤ 2498 kg/dall year101
BOD, 5-day, 20 deg. Cmaximum weekly average≤ 3747 kg/dall year101
BOD, 5-day, 20 deg. Cmonthly averagereport only (mg/L)all year101
pHinstantaneous minimum≥ 6 SUall year101
pHinstantaneous maximum≤ 9 SUall year101
Solids, total suspendedmonthly average≤ 30 mg/Lall year101
Solids, total suspendedmaximum weekly average≤ 45 mg/Lall year101
Solids, total suspendedmonthly average≤ 2498 kg/dall year101
Solids, total suspendedmaximum weekly average≤ 3747 kg/dall year101
Solids, total suspendedmonthly averagereport only (mg/L)all year101
Flow, in conduit or thru treatment plantmonthly average≤ 22 MGD (alert, not enforceable)all year101
Flow, in conduit or thru treatment plantmaximum weekly averagereport only (MGD) (alert, not enforceable)all year101
Chlorine, total residualmonthly average≤ 19 ug/Lall year101
Chlorine, total residualmaximum weekly average≤ 23 ug/Lall year101
Chlorine, total residualinstantaneous minimum≥ .6 mg/Lall year101
BOD, percent removal [total]monthly average minimum≥ 85 %all year101
E. colimonthly geometric mean≤ 126 #/100mLall year101
Solids, suspended percent removalmonthly average minimum≥ 85 %all year101
Flow, in conduit or thru treatment plantmonthly average≤ 45 MGD (alert, not enforceable)all year102
Flow, in conduit or thru treatment plantmaximum weekly averagereport only (MGD) (alert, not enforceable)all year102
Chlorine, total residualmonthly averagereport only (ug/L)all year102
Chlorine, total residualmaximum weekly averagereport only (ug/L)all year102
Chlorine, total residualinstantaneous minimum≥ 1.4 mg/Lall year102

How strict are these limits?

Cited limits by parameter: Virginia's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/VA0024970 · MCP: https://passage-data.com/mcp