Passage Data · Check a report · Use it from your AI
Sewage treatment plant, major discharger, Bedford, Virginia. NPDES permit VA0022390, in force until May 31, 2030. Last 12 months: over a limit 2 times (last March 2026), 3 required values missing, 3 of 39 reports late. Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| January 2026 | Chlorine, total residual, instantaneous minimum | .03 | ≥ .6 mg/L | 95% |
| March 2026 | Chlorine, total residual, maximum weekly average | .25 | ≤ .0051 mg/L | 4802% |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| Oxygen, dissolved [DO] | instantaneous minimum | ≥ 4 mg/L | all year |
| Oxygen, dissolved [DO] | daily minimum | ≥ 5 mg/L | all year |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 7 mg/L | all year |
| BOD, 5-day, 20 deg. C | maximum weekly average | ≤ 10.5 mg/L | all year |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 53 kg/d | all year |
| BOD, 5-day, 20 deg. C | maximum weekly average | ≤ 79 kg/d | all year |
| BOD, 5-day, 20 deg. C | monthly average | report only (mg/L) | all year |
| pH | daily minimum | ≥ 6 SU | all year |
| pH | daily maximum | ≤ 9 SU | all year |
| Solids, total suspended | monthly average | ≤ 30 mg/L | all year |
| Solids, total suspended | maximum weekly average | ≤ 45 mg/L | all year |
| Solids, total suspended | monthly average | ≤ 230 kg/d | all year |
| Solids, total suspended | maximum weekly average | ≤ 340 kg/d | all year |
| Solids, total suspended | monthly average | report only (mg/L) | all year |
| Nitrogen, ammonia total [as N] | monthly average | ≤ 3.3 mg/L | Jan–May |
| Nitrogen, ammonia total [as N] | monthly average | ≤ 1.4 mg/L | Jun–Dec |
| Nitrogen, ammonia total [as N] | maximum weekly average | ≤ 4.4 mg/L | Jan–May |
| Nitrogen, ammonia total [as N] | maximum weekly average | ≤ 1.9 mg/L | Jun–Dec |
| Phosphorus, total [as P] | monthly average | report only (mg/L) | all year |
| Phosphorus, total [as P] | monthly average | report only (lb/d) | all year |
| Phosphorus, total [as P] | monthly total | report only (lb/mo) | all year |
| Phosphorus, total [as P] | annual total | ≤ 2132 lb/yr | all year |
| Cyanide, free [amenable to chlorination] | monthly average | ≤ 16.4 ug/L | all year |
| Cyanide, free [amenable to chlorination] | maximum weekly average | ≤ 16.4 ug/L | all year |
| Hardness, total [as CaCO3] | monthly average | report only (mg/L) | all year |
| Zinc, total recoverable | monthly average | ≤ 59 ug/L | all year |
| Zinc, total recoverable | maximum weekly average | ≤ 59 ug/L | all year |
| Lead, total recoverable | monthly average | ≤ 6.8 ug/L | all year |
| Lead, total recoverable | maximum weekly average | ≤ 6.8 ug/L | all year |
| Flow, in conduit or thru treatment plant | monthly average | ≤ 2 MGD (alert, not enforceable) | all year |
| Flow, in conduit or thru treatment plant | daily maximum | report only (MGD) (alert, not enforceable) | all year |
| Chlorine, total residual | monthly average | ≤ .0043 mg/L | all year |
| Chlorine, total residual | maximum weekly average | ≤ .0051 mg/L | all year |
| Chlorine, total residual | instantaneous minimum | ≥ .6 mg/L | all year |
| BOD, percent removal [total] | monthly average minimum | ≥ 85 % | all year |
| E. coli | geometric mean | ≤ 126 #/100mL | all year |
| Phosphorus, Total As P | annual total | ≤ 2132.2 lb/yr | all year |
| Solids, suspended percent removal | monthly average minimum | ≥ 85 % | all year |
| TU Static Renewal 7-Day Chronic Ceriodaphnia dubia | maximum | ≤ 3.03 tox chronic | all year |
| TU Static Renewal 7-Day Chronic Pimphales promelas | maximum | ≤ 3.03 tox chronic | all year |
Cited limits by parameter: Virginia's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/VA0022390 · MCP: https://passage-data.com/mcp