Passage Data · Check a report · Use it from your AI

Centerfield Regional Culinary Water Treatment Plant

Water Supply, Mayfield, Utah. NPDES permit UT0025704, in force until Aug 31, 2028. Last 12 months: no values over a limit, 4 of 12 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form A monthly (9 values)
Renewal application due
Mar 4, 2028 · 180 days before expiry; your permit may set another date
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 3 of 12 reports late

Limits in force (9)

ParameterStatisticLimitMonths
Flow ratemaximum monthly average≤ .3 MGDall year
Turbiditydaily maximumreport only (NTU)all year
Turbiditymaximum monthly averagereport only (NTU)all year
Turbiditydaily maximumreport only (NTU)all year
Turbiditymaximum monthly averagereport only (NTU)all year
pHdaily minimum≥ 6.5 SUall year
pHdaily maximum≤ 9 SUall year
Turbidity, increase over backgroundtotalreport only (NTU)all year
Solids, total dissolveddaily maximum≤ 4000 mg/Lall year

Cited limits by parameter: Utah's rules and the federal ones.

Same industry: the 11 Water Supply permits in Utah.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/UT0025704 · MCP: https://passage-data.com/mcp