Passage Data · Check a report · Use it from your AI
Sawmills And Planing Mills, General, Newton, Texas. NPDES permit TX0123200, in force until Jul 11, 2028. Last 12 months: over a limit 4 times (last July 2026), 1 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| May 2026 | pH, maximum | 9.45 SU | ≤ 9 SU | — |
| June 2026 | Oxygen demand, chem. [high level] [COD], daily maximum | 153 mg/L | ≤ 150 mg/L | 2% |
| June 2026 | pH, maximum | 10.01 SU | ≤ 9 SU | — |
| July 2026 | pH, maximum | 10.01 SU | ≤ 9 SU | — |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| Temperature, water deg. fahrenheit | daily average | report only (deg F) | all year |
| Temperature, water deg. fahrenheit | daily maximum | report only (deg F) | all year |
| Oxygen demand, chem. [high level] [COD] | daily maximum | ≤ 150 mg/L | all year |
| pH | minimum | ≥ 6 SU | all year |
| pH | maximum | ≤ 9 SU | all year |
| Oil & Grease | daily maximum | ≤ 15 mg/L | all year |
| Nitrogen, total [as N] | daily maximum | report only (mg/L) | all year |
| Phosphorus, total [as P] | daily maximum | report only (mg/L) | all year |
| Silver, total [as Ag] | daily average | report only (mg/L) | all year |
| Silver, total [as Ag] | daily maximum | report only (mg/L) | all year |
| Flow, in conduit or thru treatment plant | daily average | report only (MGD) | all year |
| Flow, in conduit or thru treatment plant | daily maximum | report only (MGD) | all year |
| E. coli | daily average | report only (CFU/100mL) | all year |
| E. coli | daily maximum | report only (CFU/100mL) | all year |
Cited limits by parameter: Texas's rules and the federal ones.
Same industry: the 10 Lumber and Wood Products permits in Texas.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/TX0123200 · MCP: https://passage-data.com/mcp