Passage Data · Check a report · Use it from your AI
Sewage treatment plant, Yantis, Texas. NPDES permit TX0083003, in force until Mar 19, 2031. Last 12 months: over a limit 9 times (last June 2026), 1 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| November 2025 | Solids, total suspended, daily average | 117 mg/L | ≤ 90 mg/L | 30% |
| January 2026 | BOD, 5-day, 20 deg. C, daily average | 42.75 mg/L | ≤ 30 mg/L | 43% |
| February 2026 | BOD, 5-day, 20 deg. C, daily average | 41.475 mg/L | ≤ 30 mg/L | 38% |
| March 2026 | Solids, total suspended, daily average | 96.5 mg/L | ≤ 90 mg/L | 7% |
| April 2026 | Solids, total suspended, daily average | 134.2 mg/L | ≤ 90 mg/L | 49% |
| May 2026 | Solids, total suspended, daily average | 185.75 mg/L | ≤ 90 mg/L | 106% |
| May 2026 | Solids, total suspended, daily average | 40.975 lb/d | ≤ 32 lb/d | 28% |
| May 2026 | pH, maximum | 10.3 SU | ≤ 9 SU | — |
| June 2026 | Solids, total suspended, daily average | 141.75 mg/L | ≤ 90 mg/L | 58% |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| Oxygen, dissolved [DO] | monthly minimum | ≥ 4 mg/L | all year |
| BOD, 5-day, 20 deg. C | daily average | ≤ 30 mg/L | all year |
| BOD, 5-day, 20 deg. C | single grab sample | ≤ 100 mg/L | all year |
| BOD, 5-day, 20 deg. C | daily average | ≤ 11 lb/d | all year |
| pH | minimum | ≥ 6 SU | all year |
| pH | maximum | ≤ 9 SU | all year |
| Solids, total suspended | daily average | ≤ 90 mg/L | all year |
| Solids, total suspended | daily average | ≤ 32 lb/d | all year |
| Flow, in conduit or thru treatment plant | daily average | ≤ .042 MGD | all year |
| Flow, in conduit or thru treatment plant | daily maximum | report only (MGD) | all year |
| E. coli | daily average | ≤ 126 CFU/100mL | all year |
| E. coli | single grab sample | ≤ 399 CFU/100mL | all year |
Cited limits by parameter: Texas's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/TX0083003 · MCP: https://passage-data.com/mcp