Passage Data · Check a report · Use it from your AI
Sewage treatment plant, Brazos County, Texas. NPDES permit TX0076023, in force until Jan 2, 2029. Last 12 months: over a limit 2 times (last June 2026). Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| June 2026 | Flow, in conduit or thru treatment plant, daily average | .102 MGD | ≤ .1 MGD | 2% |
| June 2026 | Solids, total suspended, daily average | 82.3 lb/d | ≤ 75 lb/d | 10% |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| Oxygen, dissolved [DO] | monthly minimum | ≥ 4 mg/L | all year |
| BOD, 5-day, 20 deg. C | daily average | ≤ 30 mg/L | all year |
| BOD, 5-day, 20 deg. C | single grab sample | ≤ 100 mg/L | all year |
| BOD, 5-day, 20 deg. C | daily average | ≤ 25 lb/d | all year |
| pH | minimum | ≥ 6 SU | all year |
| pH | maximum | ≤ 9 SU | all year |
| Solids, total suspended | daily average | ≤ 90 mg/L | all year |
| Solids, total suspended | daily average | ≤ 75 lb/d | all year |
| Flow, in conduit or thru treatment plant | daily average | ≤ .1 MGD | all year |
| Flow, in conduit or thru treatment plant | daily maximum | report only (MGD) | all year |
| E. coli | daily average | ≤ 126 CFU/100mL | all year |
| E. coli | single grab sample | ≤ 399 CFU/100mL | all year |
Cited limits by parameter: Texas's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/TX0076023 · MCP: https://passage-data.com/mcp