Passage Data · Check a report · Use it from your AI
Sewage treatment plant, Lovelady, Texas. NPDES permit TX0027138, in force until Feb 17, 2027. Last 12 months: over a limit 4 times (last March 2026), 1 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| October 2025 | BOD, 5-day, 20 deg. C, daily average | 36.8 mg/L | ≤ 30 mg/L | 23% |
| December 2025 | E. coli, single grab sample | 2419.6 CFU/100mL | ≤ 399 CFU/100mL | 506% |
| January 2026 | E. coli, single grab sample | 478.6 CFU/100mL | ≤ 399 CFU/100mL | 20% |
| March 2026 | E. coli, single grab sample | 770.1 CFU/100mL | ≤ 399 CFU/100mL | 93% |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| Oxygen, dissolved [DO] | monthly minimum | ≥ 4 mg/L | all year |
| BOD, 5-day, 20 deg. C | daily average | ≤ 30 mg/L | all year |
| BOD, 5-day, 20 deg. C | single grab sample | ≤ 100 mg/L | all year |
| BOD, 5-day, 20 deg. C | daily average | ≤ 26 lb/d | all year |
| pH | minimum | ≥ 6 SU | all year |
| pH | maximum | ≤ 9 SU | all year |
| Solids, total suspended | daily average | ≤ 90 mg/L | all year |
| Solids, total suspended | daily average | ≤ 79 lb/d | all year |
| Flow, in conduit or thru treatment plant | daily average | ≤ .105 MGD | all year |
| Flow, in conduit or thru treatment plant | daily maximum | report only (MGD) | all year |
| E. coli | daily average | ≤ 126 CFU/100mL | all year |
| E. coli | single grab sample | ≤ 399 CFU/100mL | all year |
Cited limits by parameter: Texas's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/TX0027138 · MCP: https://passage-data.com/mcp