Big Lake, City of

Sewage treatment plant, Big Lake, Texas. NPDES permit TX0023426, in force until Jun 2, 2030. Last 12 months: over a limit 3 times (last June 2026), 2 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 20 days after each period: form A monthly (19 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
1 value over a limit, 0 required values missing, 0 of 12 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
October 2025BOD, carbonaceous [5 day, 20 C], daily maximum33.9 mg/L≤ 25 mg/L36%
June 2026BOD, carbonaceous [5 day, 20 C], daily average11.05 mg/L≤ 10 mg/L11%
June 2026BOD, carbonaceous [5 day, 20 C], daily maximum45.8 mg/L≤ 25 mg/L83%

Limits in force (19)

ParameterStatisticLimitMonths
Oxygen, dissolved [DO]monthly minimum≥ 4 mg/Lall year
pHminimum≥ 6 SUall year
pHmaximum≤ 9 SUall year
Solids, total suspendeddaily average≤ 15 mg/Lall year
Solids, total suspendeddaily maximum≤ 40 mg/Lall year
Solids, total suspendeddaily average≤ 110 lb/dall year
Nitrogen, ammonia total [as N]daily average≤ 3 mg/Lall year
Nitrogen, ammonia total [as N]daily maximum≤ 10 mg/Lall year
Nitrogen, ammonia total [as N]daily average≤ 22 lb/dall year
Sulfate, total [as SO4]daily averagereport only (mg/L)all year
Sulfate, total [as SO4]daily maximumreport only (mg/L)all year
Sulfate, total [as SO4]daily averagereport only (lb/d)all year
Flow, in conduit or thru treatment plantdaily average≤ .875 MGDall year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
E. colidaily average≤ 126 CFU/100mLall year
E. colidaily maximum≤ 399 CFU/100mLall year
BOD, carbonaceous [5 day, 20 C]daily average≤ 10 mg/Lall year
BOD, carbonaceous [5 day, 20 C]daily maximum≤ 25 mg/Lall year
BOD, carbonaceous [5 day, 20 C]daily average≤ 73 lb/dall year

How strict are these limits?

Cited limits by parameter: Texas's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/TX0023426 · MCP: https://passage-data.com/mcp