Passage Data · Check a report · Use it from your AI

Memorial Point Utility District

Sewage treatment plant, Livingston, Texas. NPDES permit TX0022845, in force until Feb 15, 2027. Last 12 months: over a limit 5 times (last June 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 20 days after each period: form A monthly (15 values)
Renewal application due
Aug 19, 2026 · 180 days before expiry; your permit may set another date
Last report on file
August 2026
Oct 2024 – Sep 2025
1 value over a limit, 0 required values missing, 0 of 12 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
May 2026Solids, total suspended, daily average33.4 lb/d≤ 25 lb/d34%
May 2026Solids, total suspended, daily average54.4 mg/L≤ 15 mg/L263%
May 2026Solids, total suspended, single grab sample125 mg/L≤ 60 mg/L108%
June 2026Solids, total suspended, daily average21.8 mg/L≤ 15 mg/L45%
June 2026Solids, total suspended, single grab sample61.4 mg/L≤ 60 mg/L2%

Limits in force (15)

ParameterStatisticLimitMonths
Oxygen, dissolved [DO]monthly minimum≥ 4 mg/Lall year
BOD, 5-day, 20 deg. Cdaily average≤ 10 mg/Lall year
BOD, 5-day, 20 deg. Csingle grab sample≤ 35 mg/Lall year
BOD, 5-day, 20 deg. Cdaily average≤ 17 lb/dall year
pHminimum≥ 6 SUall year
pHmaximum≤ 9 SUall year
Solids, total suspendeddaily average≤ 15 mg/Lall year
Solids, total suspendedsingle grab sample≤ 60 mg/Lall year
Solids, total suspendeddaily average≤ 25 lb/dall year
Flow, in conduit or thru treatment plantdaily average≤ .2 MGDall year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Chlorine, total residualmonthly minimum≥ 1 mg/Lall year
Chlorine, total residualmonthly maximum≤ 4 mg/Lall year
E. colidaily average≤ 126 CFU/100mLall year
E. colisingle grab sample≤ 399 CFU/100mLall year

How strict are these limits?

Cited limits by parameter: Texas's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/TX0022845 · MCP: https://passage-data.com/mcp