NPDES permit TN0070301 · Minor NON-POTW · expired 2025-10-31 · EPA's file as of 2026-09-26
Keep this permit as a site — opens New site at EPA's facility point (35.031987, -88.245102); you set the radius.
Check this month's numbers before you fileSign-ups are not open yet. We counted that someone asked — not who, and not which permit — and we open them once enough people do. The check stays free.
These are the last limits EPA's file holds for this permit, from an earlier version of it (version 0 in EPA's file): its current version carries none yet. Read your permit: a renewal can change them.
Last period with anything received: 2025-09-30.
Reports are due about 74 days after each monitoring period ends (read off this permit's own late-day counts in EPA's filings).
Each concentration limit against the same limit in comparable permits. Where it appears more than once, its strictest value.
| Outfall | Parameter | Statistic | Limit | Months |
|---|---|---|---|---|
| 001 | pH | minimum | >= 6 SU | all year |
| 001 | pH | minimum | >= 6 SU | all year |
| 001 | pH | daily maximum | <= 9 SU | all year |
| 001 | pH | daily maximum | <= 9 SU | all year |
| 001 | Solids, total suspended | maximum | <= 40 mg/L | all year |
| 001 | Solids, total suspended | maximum | <= 40 mg/L | all year |
| 001 | Solids, total suspended | daily maximum | <= 40 mg/L | all year |
| 001 | Solids, total suspended | daily maximum | <= 40 mg/L | all year |
| 001 | Flow, in conduit or thru treatment plant | maximum | report only | all year |
| 001 | Flow, in conduit or thru treatment plant | maximum | report only | all year |
| 001 | Flow, in conduit or thru treatment plant | daily maximum | report only | all year |
| 001 | Flow, in conduit or thru treatment plant | daily maximum | report only | all year |
Built from EPA's ECHO bulk files. EPA's file, not the permit document, is the source: read your permit. Check a report before you file it · All states