City of Covington

Sewage treatment plant, major discharger, Covington, Tennessee. NPDES permit TN0020982, in force until Mar 1, 2029. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: outfall 001 form G monthly (34 values), outfall INF1 form G monthly (6 values)
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 6 of 24 reports late

Limits in force (42)

ParameterStatisticLimitMonthsOutfall
Temperature, water deg. centigrademonthly averagereport only (deg C)all year001
Temperature, water deg. centigradedaily maximumreport only (deg C)all year001
Oxygen, dissolved [DO]instantaneous minimum≥ 1 mg/Lall year001
BOD, 5-day, 20 deg. Cmonthly average≤ 30 mg/Lall year001
BOD, 5-day, 20 deg. Cweekly average≤ 40 mg/Lall year001
BOD, 5-day, 20 deg. Cdaily maximum≤ 45 mg/Lall year001
BOD, 5-day, 20 deg. Cmonthly average≤ 906 lb/dall year001
BOD, 5-day, 20 deg. Cweekly average≤ 1208 lb/dall year001
pHminimum≥ 6 SUall year001
pHmaximum≤ 9 SUall year001
Solids, total suspendedmonthly average≤ 30 mg/Lall year001
Solids, total suspendedweekly average≤ 40 mg/Lall year001
Solids, total suspendeddaily maximum≤ 45 mg/Lall year001
Solids, total suspendedmonthly average≤ 906 lb/dall year001
Solids, total suspendedweekly average≤ 1208 lb/dall year001
Solids, settleabledaily maximum≤ 1 mL/Lall year001
Nitrogen, total [as N]quarterly averagereport only (mg/L)all year001
Nitrogen, total [as N]quarterly averagereport only (lb/d)all year001
Phosphorus, total [as P]quarterly averagereport only (mg/L)all year001
Phosphorus, total [as P]quarterly averagereport only (lb/d)all year001
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year001
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year001
Chlorine, total residualmonthly average≤ .7 mg/Lall year001
Chlorine, total residualdaily maximum≤ 1.2 mg/Lall year001
E. colimonthly geometric mean≤ 126 #/100mLall year001
E. colidaily maximum≤ 410 #/100mLall year001
SSO, Dry Weathermonthly total≤ 0 occur/moall year001
SSO, Wet Weathermonthly total≤ 0 occur/moall year001
BOD, 5-day, percent removaldaily minimum≥ 40 %all year001
BOD, 5-day, percent removalmonthly average minimum≥ 85 %all year001
Solids, suspended percent removaldaily minimum≥ 40 %all year001
Solids, suspended percent removalmonthly average minimum≥ 85 %all year001
Temperature rate of change deg. C/hrmonthly averagereport only (deg C/hr)all year001
Temperature rate of change deg. C/hrdaily maximumreport only (deg C/hr)all year001
IC25 Sub-Lethal Static Renewal 7 Day Chronic Ceriodaphnia dubiaminimum≥ 1.6 %Dec001
IC25 Sub-Lethal Static Renewal 7 Day Chronic Pimephales promelasminimum≥ 1.6 %Dec001
BOD, 5-day, 20 deg. Cmonthly averagereport only (mg/L)all yearINF1
BOD, 5-day, 20 deg. Cdaily maximumreport only (mg/L)all yearINF1
Solids, total suspendedmonthly averagereport only (mg/L)all yearINF1
Solids, total suspendeddaily maximumreport only (mg/L)all yearINF1
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all yearINF1
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all yearINF1

How strict are these limits?

Cited limits by parameter: Tennessee's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/TN0020982 · MCP: https://passage-data.com/mcp