Passage Data · Check a report · Use it from your AI

ST. Regis Mohawk Tribe

Sewerage Systems, Hogansbury, SR. NPDES permit SR0026417 expired Nov 30, 2024; its limits still apply. Last 12 months: over a limit 8 times (last August 2026), 5 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form A monthly (9 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
5 values over a limit, 0 required values missing, 2 of 12 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
October 2025Aluminum, total [as Al], daily maximum4.6 mg/L≤ 4 mg/L15%
October 2025Aluminum, total [as Al], monthly average3.45 mg/L≤ 2 mg/L73%
October 2025pH, maximum8.78 SU≤ 8.5 SU—
November 2025Aluminum, total [as Al], monthly average2.2 mg/L≤ 2 mg/L10%
April 2026pH, minimum6.28 SU≥ 6.5 SU—
July 2026Aluminum, total [as Al], monthly average2.5 mg/L≤ 2 mg/L25%
July 2026Chlorine, total residual, daily maximum2.2 mg/L≤ .5 mg/L340%
August 2026Aluminum, total [as Al], monthly average2.3 mg/L≤ 2 mg/L15%

Limits in force (9)

ParameterStatisticLimitMonths
pHminimum≥ 6.5 SUall year
pHmaximum≤ 8.5 SUall year
Solids, total suspendedmonthly average≤ 20 mg/Lall year
Solids, total suspendeddaily maximum≤ 40 mg/Lall year
Solids, settleabledaily maximum≤ .1 mL/Lall year
Aluminum, total [as Al]monthly average≤ 2 mg/Lall year
Aluminum, total [as Al]daily maximum≤ 4 mg/Lall year
Flow, in conduit or thru treatment plantdaily maximum≤ 1.4 MGDall year
Chlorine, total residualdaily maximum≤ .5 mg/Lall year

How strict are these limits?

Cited limits by parameter: the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/SR0026417 · MCP: https://passage-data.com/mcp