Passage Data · Check a report · Use it from your AI

East Dakotas Renewable Energy, LLC

Distilled And Blended Liquors, Centerville, South Dakota. NPDES permit SD0028649, in force until Jan 31, 2027. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form A monthly (19 values)
Renewal application due
Aug 4, 2026 · 180 days before expiry; your permit may set another date
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 12 reports late

Limits in force (21)

ParameterStatisticLimitMonths
Temperature, water deg. fahrenheit30-day averagereport only (deg F)all year
Temperature, water deg. fahrenheitdaily maximum≤ 90 deg Fall year
Flow rate30-day averagereport only (MGD)all year
Flow ratedaily maximumreport only (MGD)all year
Conductivity30-day average≤ 2500 umho/cmall year
Conductivitydaily maximum≤ 4375 umho/cmall year
pHdaily minimum≥ 6.5 SUall year
pHdaily maximum≤ 9 SUall year
Alkalinity, total [as CaCO3]30-day average≤ 750 mg/Lall year
Alkalinity, total [as CaCO3]daily maximum≤ 1313 mg/Lall year
Solids, total suspended30-day average≤ 90 mg/Lall year
Solids, total suspendeddaily maximum≤ 158 mg/Lall year
Oil and grease, hexane extr methoddaily maximum≤ 10 mg/Lall year
Floating solids, waste or visible foam-visualdaily maximum≤ 0 abst=0;prst=1all year
Flow, totalmonthly totalreport only (Mgal)all year
Flow, totaldaily maximumreport only (Mgal)all year
Flow, totalmonthly totalreport only (Mgal)all year
Solids, total dissolved30-day average≤ 2233 mg/Lall year
Solids, total dissolveddaily maximum≤ 4375 mg/Lall year
Duration of dischargedaily maximumreport only (d)all year
Oil and grease visualdaily maximum≤ 0 N=0;Y=1all year

How strict are these limits?

Cited limits by parameter: South Dakota's rules and the federal ones.

Same industry: the 7 Food and Kindred Products permits in South Dakota.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/SD0028649 · MCP: https://passage-data.com/mcp