Passage Data · Check a report · Use it from your AI

USCOE - Oahe Dam

Federal facility (Sewerage Systems), Pierre, South Dakota. NPDES permit SD0026794, in force until Mar 31, 2027. Last 12 months: no values over a limit, 13 of 24 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: outfall 007 form A monthly (9 values), outfall 014 form A monthly (9 values)
Renewal application due
Oct 2, 2026 · 180 days before expiry; your permit may set another date
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 12 of 24 reports late

Limits in force (18)

ParameterStatisticLimitMonthsOutfall
Temperature, water deg. centigrade30-day averagereport only (deg C)all year007
Temperature, water deg. centigradedaily maximumreport only (deg C)all year007
Flow rate30-day averagereport only (MGD)all year007
Flow ratedaily maximumreport only (MGD)all year007
pHdaily minimum≥ 6.6 SUall year007
pHdaily maximum≤ 8.6 SUall year007
Oil and grease, hexane extr methoddaily maximum≤ 10 mg/Lall year007
Floating solids, waste or visible foam-visualdaily maximum< 1 N=0;Y=1all year007
Oil and grease visualdaily maximum< 1 N=0;Y=1all year007
Temperature, water deg. centigrade30-day averagereport only (deg C)all year014
Temperature, water deg. centigradedaily maximumreport only (deg C)all year014
Flow rate30-day averagereport only (MGD)all year014
Flow ratedaily maximumreport only (MGD)all year014
pHdaily minimum≥ 6.6 SUall year014
pHdaily maximum≤ 8.6 SUall year014
Oil and grease, hexane extr methoddaily maximum≤ 10 mg/Lall year014
Floating solids, waste or visible foam-visualdaily maximum< 1 N=0;Y=1all year014
Oil and grease visualdaily maximum< 1 abst=0;prst=1all year014

How strict are these limits?

Cited limits by parameter: South Dakota's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/SD0026794 · MCP: https://passage-data.com/mcp