Gaffney Board of Public Works

Sewage treatment plant, Blacksburg, South Carolina. NPDES permit SC0047457 expired Jan 31, 2026; its limits still apply. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 29 days after each period: form 1 monthly (23 values), form 2 yearly
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 13 reports late

Limits in force (27)

ParameterStatisticLimitMonths
Oxygen, dissolved [DO]minimum≥ 1 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 45 mg/Lall year
BOD, 5-day, 20 deg. Cweekly average≤ 65 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 255 lb/dall year
BOD, 5-day, 20 deg. Cweekly average≤ 383 lb/dall year
pHminimum≥ 6 SUall year
pHmaximum≤ 8.5 SUall year
Solids, total suspendedmonthly average≤ 90 mg/Lall year
Solids, total suspendedweekly average≤ 135 mg/Lall year
Solids, total suspendedmonthly average≤ 510 lb/dall year
Solids, total suspendedweekly average≤ 765 lb/dall year
Phosphorus, total [as P]monthly averagereport only (mg/L)all year
Phosphorus, total [as P]weekly averagereport only (mg/L)all year
Phosphorus, total [as P]monthly averagereport only (lb/d)all year
Phosphorus, total [as P]weekly averagereport only (lb/d)all year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Flow, in conduit or thru treatment plantweekly averagereport only (MGD)all year
Chlorine, total residualmonthly average≤ .5 mg/Lall year
Chlorine, total residualdaily maximum≤ 1 mg/Lall year
Chlorine, total residualmonthly average≤ 2.84 lb/dall year
Chlorine, total residualdaily maximum≤ 5.67 lb/dall year
E. coli30-day geometric mean≤ 126 MPN/100mLall year
E. colidaily maximum≤ 349 MPN/100mLall year
E. coli30-day geometric mean≤ 126 MPN/100mLall year
E. colidaily maximum≤ 800 MPN/100mLall year
BOD, 5-day, percent removalmonthly average minimum≥ 65 %all year
Solids, suspended percent removalmonthly average minimum≥ 44 %all year

Cited limits by parameter: South Carolina's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/SC0047457 · MCP: https://passage-data.com/mcp