Passage Data · Check a report · Use it from your AI

SC Dept of Corrections

Correctional Institutions, Enoree, South Carolina. NPDES permit SC0036773, in force until Aug 31, 2031. Last 12 months: over a limit 2 times (last May 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 29 days after each period: form 1 monthly (31 values)
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 1 of 16 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
May 2026Chlorine, total residual, daily maximum1.04≤ 1 mg/L4%
May 2026Chlorine, total residual, monthly average.65≤ .5 mg/L30%

Limits in force (31)

ParameterStatisticLimitMonths
Oxygen, dissolved [DO]minimum≥ 2 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 30 mg/Lall year
BOD, 5-day, 20 deg. Cweekly average≤ 45 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 88 lb/dall year
BOD, 5-day, 20 deg. Cweekly average≤ 132 lb/dall year
pHminimum≥ 6 SUall year
pHmaximum≤ 8.5 SUall year
Solids, total suspendedmonthly average≤ 30 mg/Lall year
Solids, total suspendedweekly average≤ 45 mg/Lall year
Solids, total suspendedmonthly average≤ 88 lb/dall year
Solids, total suspendedweekly average≤ 132 lb/dall year
Nitrogen, total [as N]monthly averagereport only (mg/L)all year
Nitrogen, total [as N]weekly averagereport only (mg/L)all year
Nitrogen, total [as N]monthly averagereport only (lb/d)all year
Nitrogen, total [as N]weekly averagereport only (lb/d)all year
Phosphorus, total [as P]monthly averagereport only (mg/L)all year
Phosphorus, total [as P]weekly averagereport only (mg/L)all year
Phosphorus, total [as P]monthly averagereport only (lb/d)all year
Phosphorus, total [as P]weekly averagereport only (lb/d)all year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Flow, in conduit or thru treatment plantweekly averagereport only (MGD)all year
Chlorine, total residualmonthly average≤ .5 mg/Lall year
Chlorine, total residualdaily maximum≤ 1 mg/Lall year
Chlorine, total residualmonthly average≤ 1.5 lb/dall year
Chlorine, total residualdaily maximum≤ 3 lb/dall year
E. coli30-day geometric mean≤ 126 MPN/100mLall year
E. colidaily maximum≤ 349 MPN/100mLall year
E. coli30-day geometric mean≤ 126 MPN/100mLall year
E. colidaily maximum≤ 800 MPN/100mLall year
BOD, 5-day, percent removalmonthly average minimum≥ 85 %all year
Solids, suspended percent removalmonthly average minimum≥ 85 %all year

How strict are these limits?

Cited limits by parameter: South Carolina's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/SC0036773 · MCP: https://passage-data.com/mcp