Passage Data · Check a report · Use it from your AI

Altamont Mobile Home Village

Mobile Home Site Operators, Travelers Rest, South Carolina. NPDES permit SC0028533 expired May 31, 2009; its limits still apply. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 29 days after each period: form 1 monthly (25 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 12 reports late

Limits in force (25)

ParameterStatisticLimitMonths
Oxygen, dissolved [DO]instantaneous minimum≥ 2 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 30 mg/Lall year
BOD, 5-day, 20 deg. Cweekly average≤ 45 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 3 lb/dall year
BOD, 5-day, 20 deg. Cweekly average≤ 5 lb/dall year
pHminimum≥ 6 SUall year
pHmaximum≤ 8.5 SUall year
Solids, total suspendedmonthly average≤ 90 mg/Lall year
Solids, total suspendedweekly average≤ 135 mg/Lall year
Solids, total suspendedmonthly average≤ 10 lb/dall year
Solids, total suspendedweekly average≤ 15 lb/dall year
Nitrogen, total [as N]monthly averagereport only (mg/L)all year
Nitrogen, total [as N]weekly averagereport only (mg/L)all year
Nitrogen, total [as N]monthly averagereport only (lb/d)all year
Nitrogen, total [as N]weekly averagereport only (lb/d)all year
Phosphorus, total [as P]monthly averagereport only (mg/L)all year
Phosphorus, total [as P]weekly averagereport only (mg/L)all year
Phosphorus, total [as P]monthly averagereport only (lb/d)all year
Phosphorus, total [as P]weekly averagereport only (lb/d)all year
Flow, in conduit or thru treatment plantmonthly average≤ .0135 MGDall year
Flow, in conduit or thru treatment plantweekly average≤ .0135 MGDall year
Chlorine, total residualmonthly average≤ .2 mg/Lall year
Chlorine, total residualdaily maximum≤ .3 mg/Lall year
Coliform, fecal general30-day geometric mean≤ 200 #/100mLall year
Coliform, fecal generaldaily maximum≤ 400 #/100mLall year

How strict are these limits?

Cited limits by parameter: South Carolina's rules and the federal ones.

Same industry: the 27 Real Estate permits in South Carolina.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/SC0028533 · MCP: https://passage-data.com/mcp