Passage Data · Check a report · Use it from your AI

GE Gas Turbines (Greenville) L.L.C.

Turbines And Turbine Generator Sets, Greenville, South Carolina. NPDES permit SC0003484 expired Mar 31, 2018; its limits still apply. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 29 days after each period: form 1 monthly (10 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 12 reports late

Limits in force (10)

ParameterStatisticLimitMonths
BOD, 5-day, 20 deg. Cmonthly average≤ 30 mg/Lall year
BOD, 5-day, 20 deg. Cdaily maximum≤ 60 mg/Lall year
pHinstantaneous minimum≥ 6 SUall year
pHinstantaneous maximum≤ 8.5 SUall year
Tetrachloroethylenemonthly average≤ 90.7 ug/Lall year
Tetrachloroethylenedaily maximum≤ 127 ug/Lall year
Trichloroethylenemonthly average≤ 7.2 ug/Lall year
Trichloroethylenedaily maximum≤ 14.4 ug/Lall year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year

How strict are these limits?

Cited limits by parameter: South Carolina's rules and the federal ones.

Same industry: the 5 Industrial and Commercial Machinery and Computer Equipment permits in South Carolina.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/SC0003484 · MCP: https://passage-data.com/mcp