Passage Data · Check a report · Use it from your AI

Kimberly-Clark Corporation

Paper Mills, major discharger, Beech Island, South Carolina. NPDES permit SC0000582 expired Jun 30, 2022; its limits still apply. Last 12 months: no values over a limit, 8 required values missing. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 29 days after each period: form 1 monthly (23 values), form 2 quarterly (2 values), form 3 yearly
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 8 required values missing, 0 of 17 reports late

Limits in force (31)

ParameterStatisticLimitMonths
Oxygen demand, ultimatemonthly average≤ 14612 lb/dJan, Feb, Nov, Dec
Oxygen demand, ultimatemonthly average≤ 3649 lb/dMar–Oct
Oxygen demand, ultimatemonthly average≤ 14612 lb/dJan, Feb, Nov, Dec
Oxygen demand, ultimatedaily maximum≤ 29224 lb/dJan, Feb, Nov, Dec
Oxygen demand, ultimatedaily maximum≤ 7298 lb/dMar–Oct
Oxygen demand, ultimatedaily maximum≤ 29224 lb/dJan, Feb, Nov, Dec
Oxygen, dissolved [DO]instantaneous minimum≥ 4 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly averagereport only (mg/L)all year
BOD, 5-day, 20 deg. Cdaily maximumreport only (mg/L)all year
BOD, 5-day, 20 deg. Cmonthly average≤ 4031 lb/dall year
BOD, 5-day, 20 deg. Cdaily maximum≤ 7599 lb/dall year
pHinstantaneous minimumreport only (SU)all year
pHinstantaneous maximumreport only (SU)all year
Solids, total suspendedmonthly averagereport only (mg/L)all year
Solids, total suspendeddaily maximumreport only (mg/L)all year
Solids, total suspendedmonthly average≤ 4231 lb/dall year
Solids, total suspendeddaily maximum≤ 9304 lb/dall year
Nitrogen, ammonia total [as N]monthly averagereport only (mg/L)all year
Nitrogen, ammonia total [as N]daily maximumreport only (mg/L)all year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Mercury, total [as Hg]monthly averagereport only (ng/L)all year
Mercury, total [as Hg]daily maximumreport only (ng/L)all year
Length of longest pH excursioninstantaneous maximum≤ 60 minall year
% of time exceeding pH limitsinstantaneous maximum≤ 1 %all year
Flow, recycledmonthly averagereport only (MGD)all year
Flow, recycleddaily maximumreport only (MGD)all year
Flow, process wastewatermonthly averagereport only (MGD)all year
Flow, process wastewaterdaily maximumreport only (MGD)all year
%Effect Static Renewal 7 Day Chronic Ceriodaphnia dubiamonthly average≤ 25 %all year
%Effect Static Renewal 7 Day Chronic Ceriodaphnia dubiadaily maximum≤ 40 %all year

How strict are these limits?

Cited limits by parameter: South Carolina's rules and the federal ones.

Same industry: the 9 Paper and Allied Products permits in South Carolina.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/SC0000582 · MCP: https://passage-data.com/mcp