Passage Data · Check a report · Use it from your AI

Prasa Morovis - Rio Grande WTP

Water Supply, Rio Grande, Puerto Rico. NPDES permit PR0026611 expired Oct 31, 2024; its limits still apply. Last 12 months: over a limit once (last November 2025). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form A monthly (14 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
6 values over a limit, 0 required values missing, 1 of 12 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
November 2025Sulfide-hydrogen sulfide [undissociated], daily maximum2.6 ug/L≤ 2 ug/L30%

Limits in force (20)

ParameterStatisticLimitMonths
Temperature, water deg. centigradedaily maximum≤ 32.2 deg Call year
Turbiditydaily maximum≤ 50 NTUall year
Turbiditydaily maximum≤ 122 NTUall year
Color [PT-CO units]daily maximum≤ 15 col unit (pc)all year
Color [PT-CO units]daily maximum≤ 30 col unit (pc)all year
Oxygen, dissolved [DO]instantaneous minimum≥ 5 mg/Lall year
BOD, 5-day, 20 deg. Cdaily maximum≤ 5 mg/Lall year
BOD, 5-day, 20 deg. Cdaily maximum≤ 14 mg/Lall year
pHminimum≥ 6 SUall year
pHmaximum≤ 9 SUall year
Solids, settleabledaily maximumreport only (mL/L)all year
Copper, total [as Cu]daily maximum≤ 2 ug/Lall year
Copper, total [as Cu]daily maximum≤ 24.31 ug/Lall year
Lead, total [as Pb]daily maximum≤ .4 ug/Lall year
Lead, total [as Pb]daily maximumreport only (ug/L)all year
Flow, in conduit or thru treatment plantdaily maximum≤ .05 MGDall year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Chlorine, total residualdaily maximum≤ 11 ug/Lall year
Sulfide-hydrogen sulfide [undissociated]daily maximum≤ 2 ug/Lall year
Ammonia & ammonium- totaldaily maximumreport only (ug/L)all year

How strict are these limits?

Cited limits by parameter: we hold no rule of Puerto Rico's own; the federal ones.

Same industry: the 108 Water Supply permits in Puerto Rico.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/PR0026611 · MCP: https://passage-data.com/mcp