Passage Data · Check a report · Use it from your AI

River Hill Coal Co Inc

Bituminous Coal And Lignite - Surface, Madera, Pennsylvania. NPDES permit PA0243132, in force until Aug 14, 2027. Last 12 months: no values over a limit, 30 required values missing. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 58 days after each period: form A quarterly (20 values)
Renewal application due
Feb 15, 2027 · 180 days before expiry; your permit may set another date
Last report on file
March 2026
Oct 2024 – Sep 2025
1 value over a limit, 0 required values missing, 3 of 12 reports late

Limits in force (20)

ParameterStatisticLimitMonths
Temperature, water deg. centigradeinstantaneous maximumreport only (deg C)all year
Temperature, water deg. centigradeinstantaneous maximumreport only (deg C)all year
Specific conductanceinstantaneous maximumreport only (umho/cm)all year
Specific conductanceinstantaneous maximumreport only (umho/cm)all year
pHinstantaneous maximumreport only (SU)all year
pHinstantaneous maximumreport only (SU)all year
Acidity, total [as CaCO3]instantaneous maximum≤ .476 lb/dall year
Acidity, total [as CaCO3]instantaneous maximum≤ .476 lb/dall year
Solids, total suspendedinstantaneous maximumreport only (mg/L)all year
Solids, total suspendedinstantaneous maximumreport only (mg/L)all year
Sulfate, total [as SO4]instantaneous maximumreport only (mg/L)all year
Sulfate, total [as SO4]instantaneous maximumreport only (mg/L)all year
Iron, total [as Fe]instantaneous maximum≤ .202 lb/dall year
Iron, total [as Fe]instantaneous maximum≤ .202 lb/dall year
Manganese, total [as Mn]instantaneous maximum≤ .135 lb/dall year
Manganese, total [as Mn]instantaneous maximum≤ .135 lb/dall year
Aluminum, total [as Al]instantaneous maximum≤ .0461 lb/dall year
Aluminum, total [as Al]instantaneous maximum≤ .0461 lb/dall year
Flow, in conduit or thru treatment plantinstantaneous maximumreport only (gal/min)all year
Flow, in conduit or thru treatment plantinstantaneous maximumreport only (gal/min)all year

Cited limits by parameter: Pennsylvania's rules and the federal ones.

Same industry: the 351 Coal Mining permits in Pennsylvania.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/PA0243132 · MCP: https://passage-data.com/mcp