Passage Data · Check a report · Use it from your AI

JR Coal Contr Inc

Bituminous Coal And Lignite - Surface, Philipsburg, Pennsylvania. NPDES permit PA0238104, in force until Sep 19, 2029. Last 12 months: no values over a limit, 42 required values missing, 2 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form A quarterly (21 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 3 of 12 reports late

Limits in force (21)

ParameterStatisticLimitMonths
Temperature, water deg. centigradeinstantaneous maximumreport only (deg C)all year
Specific conductanceinstantaneous maximumreport only (umho/cm)all year
pHinstantaneous minimum≥ 6 SUall year
pHinstantaneous maximum≤ 9 SUall year
Alkalinity, total [as CaCO3]instantaneous maximumreport only (mg/L)all year
Acidity, total [as CaCO3]instantaneous maximumreport only (mg/L)all year
Solids, total suspendedmonthly average≤ 35 mg/Lall year
Solids, total suspendeddaily maximum≤ 70 mg/Lall year
Solids, total suspendedinstantaneous maximum≤ 90 mg/Lall year
Sulfate, total [as SO4]instantaneous maximumreport only (mg/L)all year
Iron, total [as Fe]monthly average≤ 3 mg/Lall year
Iron, total [as Fe]daily maximum≤ 6 mg/Lall year
Iron, total [as Fe]instantaneous maximum≤ 7 mg/Lall year
Manganese, total [as Mn]monthly average≤ 2 mg/Lall year
Manganese, total [as Mn]daily maximum≤ 4 mg/Lall year
Manganese, total [as Mn]instantaneous maximum≤ 5 mg/Lall year
Aluminum, total [as Al]monthly average≤ 2 mg/Lall year
Aluminum, total [as Al]daily maximum≤ 4 mg/Lall year
Aluminum, total [as Al]instantaneous maximum≤ 5 mg/Lall year
Flow, in conduit or thru treatment plantinstantaneous maximumreport only (gal/min)all year
Alkalinity - Acidity [as CaCO3]instantaneous minimum≥ 0 mg/Lall year

How strict are these limits?

Cited limits by parameter: Pennsylvania's rules and the federal ones.

Same industry: the 351 Coal Mining permits in Pennsylvania.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/PA0238104 · MCP: https://passage-data.com/mcp