Cnty Line Quarry LLC

Industrial or other facility, Wrightsville, Pennsylvania. NPDES permit PA0119628, in force until Mar 13, 2027. Last 12 months: no values over a limit, 33 required values missing. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form A quarterly (22 values), form Y yearly
Renewal application due
Sep 14, 2026 · 180 days before expiry; your permit may set another date
Last report on file
March 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 6 of 13 reports late

Limits in force (23)

ParameterStatisticLimitMonths
pHinstantaneous minimum≥ 6 SUall year
pHinstantaneous minimum≥ 6 SUall year
pHinstantaneous maximum≤ 9 SUall year
pHinstantaneous maximum≤ 9 SUall year
Alkalinity, total [as CaCO3]instantaneous maximumreport only (mg/L)all year
Alkalinity, total [as CaCO3]instantaneous maximumreport only (mg/L)all year
Acidity, total [as CaCO3]instantaneous maximumreport only (mg/L)all year
Acidity, total [as CaCO3]instantaneous maximumreport only (mg/L)all year
Solids, total suspendedmonthly average≤ 35 mg/Lall year
Solids, total suspendedmonthly average≤ 35 mg/Lall year
Solids, total suspendeddaily maximum≤ 70 mg/Lall year
Solids, total suspendeddaily maximum≤ 70 mg/Lall year
Solids, total suspendedinstantaneous maximum≤ 90 mg/Lall year
Solids, total suspendedinstantaneous maximum≤ 90 mg/Lall year
Oil & Greaseinstantaneous maximumreport only (mg/L)all year
Sulfate, total [as SO4]instantaneous maximumreport only (mg/L)all year
Sulfate, total [as SO4]instantaneous maximumreport only (mg/L)all year
Flow, in conduit or thru treatment plantdaily maximum≤ 4.32 MGDall year
Flow, in conduit or thru treatment plantdaily maximum≤ 4.32 MGDall year
Alkalinity - Acidity [as CaCO3]instantaneous minimum≥ 0 mg/Lall year
Alkalinity - Acidity [as CaCO3]instantaneous minimum≥ 0 mg/Lall year
Solids, total dissolvedinstantaneous maximumreport only (mg/L)all year
Solids, total dissolvedinstantaneous maximumreport only (mg/L)all year

Cited limits by parameter: Pennsylvania's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/PA0119628 · MCP: https://passage-data.com/mcp