BHB Ind LLC

Plastics Foam Products, Cambridge Springs, Pennsylvania. NPDES permit PA0101273, in force until Nov 30, 2030. Last 12 months: over a limit 6 times (last May 2026), 57 required values missing, 7 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form A monthly (6 values), form Y yearly
Last report on file
May 2026
Oct 2024 – Sep 2025
7 values over a limit, 32 required values missing, 9 of 14 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
October 2025pH, daily maximum9.11 SU≤ 9 SU—
March 2026Chlorine, total residual, monthly average1.01 mg/L≤ .5 mg/L102%
March 2026Chlorine, total residual, monthly average1.01 mg/L≤ .5 mg/L102%
April 2026Chlorine, total residual, monthly average1.41 mg/L≤ .5 mg/L182%
April 2026Chlorine, total residual, monthly average1.41 mg/L≤ .5 mg/L182%
May 2026Chlorine, total residual, monthly average.52 mg/L≤ .5 mg/L4%

Limits in force (11)

ParameterStatisticLimitMonths
Temperature, water deg. fahrenheitinstantaneous maximum≤ 110 deg Fall year
pHinstantaneous minimum≥ 6 SUall year
pHinstantaneous maximum≤ 9 SUall year
Nitrogen, ammonia total [as N]daily maximumreport only (mg/L)all year
Chloride [as Cl]daily maximumreport only (mg/L)all year
Copper, total [as Cu]daily maximumreport only (mg/L)all year
Nickel, total [as Ni]daily maximumreport only (mg/L)all year
Zinc, total [as Zn]daily maximumreport only (mg/L)all year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Chlorine, total residualmonthly average≤ .5 mg/Lall year
Chlorine, total residualinstantaneous maximum≤ 1.2 mg/Lall year

How strict are these limits?

Cited limits by parameter: Pennsylvania's rules and the federal ones.

Same industry: the 33 Rubber and Miscellaneous Plastics Products permits in Pennsylvania.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/PA0101273 · MCP: https://passage-data.com/mcp