Passage Data · Check a report · Use it from your AI

Rouseville Boro Venango Cnty

Sewage treatment plant, Rouseville, Pennsylvania. NPDES permit PA0024392, in force until Sep 30, 2028. Last 12 months: over a limit 4 times (last May 2026), 25 required values missing, 1 of 13 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 28 days after each period: form A monthly (25 values), form Q quarterly (5 values)
Renewal application due
Apr 3, 2028 · 180 days before expiry; your permit may set another date
Last report on file
June 2026
Oct 2024 – Sep 2025
5 values over a limit, 1 required value missing, 1 of 16 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
November 2025Coliform, fecal general, instantaneous maximum12100 #/100mL≤ 10000 #/100mL21%
February 2026Coliform, fecal general, instantaneous maximum12100 #/100mL≤ 10000 #/100mL21%
May 2026Chlorine, total residual, instantaneous maximum2 mg/L≤ 1.6 mg/L25%
May 2026Chlorine, total residual, monthly average.97 mg/L≤ .5 mg/L94%

Limits in force (32)

ParameterStatisticLimitMonths
Oxygen, dissolved [DO]daily minimum≥ 4 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly averagereport only (mg/L)all year
BOD, 5-day, 20 deg. Cmonthly averagereport only (lb/d)all year
BOD, 5-day, 20 deg. Cdaily maximumreport only (lb/d)all year
pHdaily minimum≥ 6 SUall year
pHdaily maximum≤ 9 SUall year
Solids, total suspendedmonthly average≤ 30 mg/Lall year
Solids, total suspendedweekly average≤ 45 mg/Lall year
Solids, total suspendedmonthly average≤ 60 lb/dall year
Solids, total suspendedweekly average≤ 90 lb/dall year
Solids, total suspendedmonthly averagereport only (mg/L)all year
Solids, total suspendedmonthly averagereport only (lb/d)all year
Solids, total suspendeddaily maximumreport only (lb/d)all year
Nitrogen, total [as N]quarterly averagereport only (mg/L)all year
Nitrogen, total [as N]quarterly averagereport only (lb/d)all year
Nitrogen, ammonia total [as N]monthly averagereport only (mg/L)all year
Nitrogen, ammonia total [as N]monthly averagereport only (lb/d)all year
Phosphorus, total [as P]quarterly averagereport only (mg/L)all year
Phosphorus, total [as P]quarterly averagereport only (lb/d)all year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Chlorine, total residualmonthly average≤ .5 mg/Lall year
Chlorine, total residualinstantaneous maximum≤ 1.6 mg/Lall year
E. coliinstantaneous maximumreport only (#/100mL)all year
Coliform, fecal generalgeometric mean≤ 2000 #/100mLJan, Feb, Mar, Apr, Oct, Nov, Dec
Coliform, fecal generalgeometric mean≤ 200 #/100mLMay–Sep
Coliform, fecal generalinstantaneous maximum≤ 10000 #/100mLJan, Feb, Mar, Apr, Oct, Nov, Dec
Coliform, fecal generalinstantaneous maximum≤ 1000 #/100mLMay–Sep
BOD, carbonaceous [5 day, 20 C]monthly average≤ 25 mg/Lall year
BOD, carbonaceous [5 day, 20 C]weekly average≤ 40 mg/Lall year
BOD, carbonaceous [5 day, 20 C]monthly average≤ 50 lb/dall year
BOD, carbonaceous [5 day, 20 C]weekly average≤ 80 lb/dall year

Cited limits by parameter: Pennsylvania's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/PA0024392 · MCP: https://passage-data.com/mcp