Dayville, City of

Sewage treatment plant, Dayville, Oregon. NPDES permit OR0041505 expired Jul 31, 2026; its limits still apply. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: form A monthly (1 value), form G monthly (6 values)
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 25 reports late

Limits in force (34)

ParameterStatisticLimitMonths
Temperature, water deg. centigradedaily maximumreport only (deg C)Jan, Feb, Mar, Apr, Nov, Dec
Temperature, water deg. centigrademaximum 7-day averagereport only (deg C)Jan, Feb, Mar, Apr, Nov, Dec
BOD, 5-day, 20 deg. Cmonthly average≤ 30 mg/LJan, Feb, Mar, Apr, Nov, Dec
BOD, 5-day, 20 deg. Cmonthly average≤ 9.3 lb/dJan, Feb, Mar, Apr, Nov, Dec
BOD, 5-day, 20 deg. Cdaily maximum≤ 19 lb/dJan, Feb, Mar, Apr, Nov, Dec
BOD, 5-day, 20 deg. Cmonthly averagereport only (mg/L)all year
BOD, 5-day, 20 deg. Cweekly average≤ 45 mg/LJan, Feb, Mar, Apr, Nov, Dec
BOD, 5-day, 20 deg. Cweekly average≤ 14 lb/dJan, Feb, Mar, Apr, Nov, Dec
pHdaily minimum≥ 6 SUJan, Feb, Mar, Apr, Nov, Dec
pHdaily maximum≤ 9 SUJan, Feb, Mar, Apr, Nov, Dec
pHmonthly minimumreport only (SU)all year
pHmonthly maximumreport only (SU)all year
Solids, total suspendedmonthly average≤ 85 mg/LJan, Feb, Mar, Apr, Nov, Dec
Solids, total suspendedmonthly average≤ 26 lb/dJan, Feb, Mar, Apr, Nov, Dec
Solids, total suspendeddaily maximum≤ 52 lb/dJan, Feb, Mar, Apr, Nov, Dec
Solids, total suspendedmonthly averagereport only (mg/L)all year
Solids, total suspendedweekly average≤ 140 mg/LJan, Feb, Mar, Apr, Nov, Dec
Solids, total suspendedweekly average≤ 39 lb/dJan, Feb, Mar, Apr, Nov, Dec
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)Jan, Feb, Mar, Apr, Nov, Dec
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)Jan, Feb, Mar, Apr, Nov, Dec
Flow, in conduit or thru treatment plantdaily maximum≤ 0 MGDMay–Oct
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Chlorine, total residualmonthly average≤ .05 mg/LJan, Feb, Mar, Apr, Nov, Dec
Chlorine, total residualdaily maximum≤ .13 mg/LJan, Feb, Mar, Apr, Nov, Dec
E. colimonthly geometric mean≤ 126 #/100mLJan, Feb, Mar, Apr, Nov, Dec
E. colidaily maximum≤ 406 #/100mLJan, Feb, Mar, Apr, Nov, Dec
E. colimonthly geometric mean≤ 126 #/100mLJan, Feb, Mar, Apr, Nov, Dec
E. colidaily maximumreport only (#/100mL)Jan, Feb, Mar, Apr, Nov, Dec
Excess thermal loadmaximum 7-day average≤ 1.9 mkcal/dayNov, Dec
Excess thermal loadmaximum 7-day average≤ 17 mkcal/dayJan–Apr
BOD, 5-day, percent removalmonthly average minimum≥ 85 %Jan, Feb, Mar, Apr, Nov, Dec
Solids, suspended percent removalmonthly average minimum≥ 65 %Jan, Feb, Mar, Apr, Nov, Dec
Chlorine usagemonthly averagereport only (lb/d)Jan, Feb, Mar, Apr, Nov, Dec

How strict are these limits?

Cited limits by parameter: Oregon's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/OR0041505 · MCP: https://passage-data.com/mcp