Passage Data · Check a report · Use it from your AI

Rainbow Rock Service Association, Inc.

Sewage treatment plant, Brookings, Oregon. NPDES permit OR0030945, in force until Jan 31, 2027. Last 12 months: over a limit once (last February 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: form A monthly (25 values), form G monthly (4 values), form Q quarterly (1 value)
Renewal application due
Aug 4, 2026 · 180 days before expiry; your permit may set another date
Last report on file
September 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 3 of 28 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingParameterReportedLimitOver by
February 2026BOD, 5-day, percent removal, monthly average minimum84 %≥ 85 %7%

Limits in force (30)

ParameterStatisticLimitMonths
Temperature, water deg. centigrademonthly averagereport only (deg C)all year
Temperature, water deg. centigradedaily maximumreport only (deg C)all year
Temperature, water deg. centigrade7-day averagereport only (deg C)all year
BOD, 5-day, 20 deg. Cmonthly average≤ 30 mg/Lall year
BOD, 5-day, 20 deg. Cmonthly average≤ 7.5 lb/dall year
BOD, 5-day, 20 deg. Cdaily maximum≤ 15 lb/dall year
BOD, 5-day, 20 deg. Cmonthly averagereport only (mg/L)all year
BOD, 5-day, 20 deg. Cweekly average≤ 45 mg/Lall year
BOD, 5-day, 20 deg. Cweekly average≤ 11 lb/dall year
pHdaily minimum≥ 6 SUall year
pHdaily maximum≤ 9 SUall year
pHmonthly minimumreport only (SU)all year
pHmonthly maximumreport only (SU)all year
Alkalinity, total [as CaCO3]monthly maximumreport only (mg/L)all year
Solids, total suspendedmonthly average≤ 30 mg/Lall year
Solids, total suspendedmonthly average≤ 7.5 lb/dall year
Solids, total suspendeddaily maximum≤ 15 lb/dall year
Solids, total suspendedmonthly averagereport only (mg/L)all year
Solids, total suspendedweekly average≤ 45 mg/Lall year
Solids, total suspendedweekly average≤ 11 lb/dall year
Coliform, fecal - % samples exceeding limittotal≤ 10 %all year
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Enterococci - % samples exceeding limittotal≤ 10 %all year
Enterococcimonthly geometric mean≤ 35 #/100mLall year
Enterococcidaily maximumreport only (#/100mL)all year
Coliform, fecal generalmonthly median≤ 14 #/100mLall year
Coliform, fecal generaldaily maximumreport only (#/100mL)all year
BOD, 5-day, percent removalmonthly average minimum≥ 85 %all year
Solids, suspended percent removalmonthly average minimum≥ 85 %all year

How strict are these limits?

Cited limits by parameter: Oregon's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/OR0030945 · MCP: https://passage-data.com/mcp