Passage Data · Check a report · Use it from your AI

Monroe, City of

Sewage treatment plant, Monroe, Oregon. NPDES permit OR0029203, in force until Apr 30, 2027. Last 12 months: no values over a limit. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 15 days after each period: form A monthly (1 value), form G monthly (6 values), form L monthly (6 values)
Renewal application due
Nov 1, 2026 · 180 days before expiry; your permit may set another date
Last report on file
September 2026
Oct 2024 – Sep 2025
1 value over a limit, 0 required values missing, 0 of 36 reports late

Limits in force (39)

ParameterStatisticLimitMonths
Temperature, water deg. centigrademonthly averagereport only (deg C)Jan, Feb, Mar, Apr, Nov, Dec
Temperature, water deg. centigradedaily maximumreport only (deg C)Jan, Feb, Mar, Apr, Nov, Dec
Temperature, water deg. centigrade7-day averagereport only (deg C)Jan, Feb, Mar, Apr, Nov, Dec
BOD, 5-day, 20 deg. Cmonthly average≤ 30 mg/LJan, Feb, Mar, Apr, Nov, Dec
BOD, 5-day, 20 deg. Cmonthly average≤ 45 lb/dJan, Feb, Mar, Apr, Nov, Dec
BOD, 5-day, 20 deg. Cdaily maximum≤ 90 lb/dJan, Feb, Mar, Apr, Nov, Dec
BOD, 5-day, 20 deg. Cmonthly averagereport only (mg/L)all year
BOD, 5-day, 20 deg. Cmaximum weekly average≤ 45 mg/LJan, Feb, Mar, Apr, Nov, Dec
BOD, 5-day, 20 deg. Cmaximum weekly average≤ 68 lb/dJan, Feb, Mar, Apr, Nov, Dec
pHdaily minimum≥ 6 SUJan, Feb, Mar, Apr, Nov, Dec
pHdaily maximum≤ 9 SUJan, Feb, Mar, Apr, Nov, Dec
pHmonthly minimumreport only (SU)all year
pHmonthly maximumreport only (SU)all year
Alkalinity, total [as CaCO3]maximumreport only (mg/L)Jan, Mar, Apr, Nov
Solids, total suspendedmonthly average≤ 50 mg/LJan, Feb, Mar, Apr, Nov, Dec
Solids, total suspendedmonthly average≤ 75 lb/dJan, Feb, Mar, Apr, Nov, Dec
Solids, total suspendeddaily maximum≤ 150 lb/dJan, Feb, Mar, Apr, Nov, Dec
Solids, total suspendedmonthly averagereport only (mg/L)all year
Solids, total suspendedmaximum weekly average≤ 75 mg/LJan, Feb, Mar, Apr, Nov, Dec
Solids, total suspendedmaximum weekly average≤ 110 lb/dJan, Feb, Mar, Apr, Nov, Dec
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)Jan, Feb, Mar, Apr, Nov, Dec
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)Jan, Feb, Mar, Apr, Nov, Dec
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year
Chlorine, total residualmonthly average≤ .08 mg/LJan, Feb, Mar, Apr, Nov, Dec
Chlorine, total residualdaily maximum≤ .21 mg/LJan, Feb, Mar, Apr, Nov, Dec
E. colimonthly geometric mean≤ 126 #/100mLJan, Feb, Mar, Apr, Nov, Dec
E. colidaily maximum≤ 406 #/100mLJan, Feb, Mar, Apr, Nov, Dec
E. colimonthly geometric mean≤ 126 #/100mLJan, Feb, Mar, Apr, Nov, Dec
E. colidaily maximumreport only (#/100mL)Jan, Feb, Mar, Apr, Nov, Dec
Flow, totaldaily maximum≤ 0 galMay–Oct
BOD, 5-day, percent removalmonthly average minimum≥ 85 %Jan, Feb, Mar, Apr, Nov, Dec
Solids, suspended percent removalmonthly average minimum≥ 65 %Jan, Feb, Mar, Apr, Nov, Dec
Lagoon freeboardmonthly minimumreport only (ft)all year
Lagoon freeboardmonthly maximumreport only (ft)all year
Lagoon freeboardmonthly minimumreport only (ft)all year
Lagoon freeboardmonthly maximumreport only (ft)all year
Lagoon freeboardmonthly minimumreport only (ft)all year
Lagoon freeboardmonthly maximumreport only (ft)all year

How strict are these limits?

Cited limits by parameter: Oregon's rules and the federal ones.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/OR0029203 · MCP: https://passage-data.com/mcp