Bokoshe PWA

NPDES permit OK0027731 · Minor POTW · effective, expires 2029-08-31 · EPA's file as of 2026-09-19

Check this month's numbers before you file

EPA's record, 2025-09-01 to 2026-08-31

8values over a limit
0required values missing, on 0 form(s)
6of 11 forms filed late

Last period with anything received: 2026-07-31. Most often over: pH (7), BOD, 5-day, 20 deg. C (1).

Reporting

Reports are due about 15 days after each monitoring period ends (read off this permit's own late-day counts in EPA's filings).

Limits in force (12)

OutfallParameterStatisticLimitMonths
001BOD, 5-day, 20 deg. CMO AVG <= 30 mg/L Jan, Feb, Mar, Apr, May, Nov, Dec
001BOD, 5-day, 20 deg. CWKLY AVG <= 45 mg/L Jan, Feb, Mar, Apr, May, Nov, Dec
001BOD, 5-day, 20 deg. CMO AVG <= 22.52 lb/d Jan, Feb, Mar, Apr, May, Nov, Dec
001pHMINIMUM >= 6.5 SU Jan, Feb, Mar, Apr, May, Nov, Dec
001pHMAXIMUM <= 9 SU Jan, Feb, Mar, Apr, May, Nov, Dec
001Solids, total suspendedMO AVG <= 90 mg/L Jan, Feb, Mar, Apr, May, Nov, Dec
001Solids, total suspendedWKLY AVG <= 135 mg/L Jan, Feb, Mar, Apr, May, Nov, Dec
001Solids, total suspendedMO AVG <= 67.55 lb/d Jan, Feb, Mar, Apr, May, Nov, Dec
001Flow, in conduit or thru treatment plantMO AVG report only Jan, Feb, Mar, Apr, May, Nov, Dec
001Flow, in conduit or thru treatment plantMO AVG <= 0 MGD Jun, Jul, Aug, Sep, Oct
001Flow, in conduit or thru treatment plantDAILY MX report only Jan, Feb, Mar, Apr, May, Nov, Dec
001Flow, in conduit or thru treatment plantDAILY MX <= 0 MGD Jun, Jul, Aug, Sep, Oct

Built from EPA's ECHO bulk files. EPA's file, not the permit document, is the source: read your permit. Check a report before you file it · All states