Passage Data · Check a report · Use it from your AI

Fuyao Glass America Inc.

Products Of Purchased Glass, Moraine, Ohio. NPDES permit OH0147842, in force until May 31, 2028. Last 12 months: no values over a limit, 30 of 66 reports late. Source: EPA ECHO, Oct 22, 2026.

Reports due
About 20 days after each period: outfall 001 form A monthly (12 values), outfall 002 form A monthly (12 values), outfall 601 form A monthly (2 values), outfall 602 form A monthly (2 values), outfall 603 form A monthly (2 values), outfall 604 form A monthly (2 values)
Renewal application due
Dec 3, 2027 · 180 days before expiry; your permit may set another date
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 69 reports late

Limits in force (32)

ParameterStatisticLimitMonthsOutfall
Temperature, water deg. centigrademonthly averagereport only (deg C)all year001
Temperature, water deg. centigradedaily maximumreport only (deg C)all year001
Oxygen, dissolved [DO]daily minimum≥ 5 mg/Lall year001
pHdaily minimum≥ 6.5 SUall year001
pHdaily maximum≤ 9 SUall year001
Solids, total suspendedmonthly average≤ 15.8 mg/Lall year001
Solids, total suspendeddaily maximum≤ 15.8 mg/Lall year001
Oil and grease, hexane extr methoddaily maximum≤ 10 mg/Lall year001
Phosphorus, total [as P]monthly average≤ 4.8 mg/Lall year001
Phosphorus, total [as P]daily maximum≤ 4.8 mg/Lall year001
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year001
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year001
Temperature, water deg. centigrademonthly averagereport only (deg C)all year002
Temperature, water deg. centigradedaily maximumreport only (deg C)all year002
Oxygen, dissolved [DO]daily minimum≥ 5 mg/Lall year002
pHdaily minimum≥ 6.5 SUall year002
pHdaily maximum≤ 9 SUall year002
Solids, total suspendedmonthly average≤ 15.8 mg/Lall year002
Solids, total suspendeddaily maximum≤ 15.8 mg/Lall year002
Oil and grease, hexane extr methoddaily maximum≤ 10 mg/Lall year002
Phosphorus, total [as P]monthly average≤ 4.8 mg/Lall year002
Phosphorus, total [as P]daily maximum≤ 4.8 mg/Lall year002
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year002
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year002
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year601
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year601
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year602
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year602
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year603
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year603
Flow, in conduit or thru treatment plantmonthly averagereport only (MGD)all year604
Flow, in conduit or thru treatment plantdaily maximumreport only (MGD)all year604

How strict are these limits?

Cited limits by parameter: Ohio's rules and the federal ones.

Same industry: the 36 Stone, Clay, Glass and Concrete Products permits in Ohio.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/OH0147842 · MCP: https://passage-data.com/mcp