Passage Data · Check a report · Use it from your AI

CCU Coal & Construction LLC

Bituminous Coal And Lignite - Surface, Cadiz, Ohio. NPDES permit OH0059889 expired Oct 31, 2026. Last 12 months: over a limit 2 times (last May 2026). Source: EPA ECHO, Oct 22, 2026.

Reports due
About 20 days after each period: outfall 001 form A monthly (14 values), outfall 003 form A monthly (13 values)
Last report on file
August 2026
Oct 2024 – Sep 2025
0 values over a limit, 0 required values missing, 0 of 24 reports late

Last 12 months (Oct 1, 2025 – Sep 30, 2026)

Period endingOutfallParameterReportedLimitOver by
April 2026001Solids, total suspended, monthly average40≤ 35 mg/L14%
May 2026003Copper, total recoverable, daily maximum64.71≤ 29 ug/L123%

Limits in force (41)

ParameterStatisticLimitMonthsOutfall
Flow ratemonthly averagereport only (gal/d)all year001
Flow ratedaily maximumreport only (gal/d)all year001
pHdaily minimum≥ 6.5 SUall year001
pHdaily maximum≤ 9 SUall year001
Residue, tot fltrble [dried at 105 C]monthly averagereport only (mg/L)Apr001
Residue, tot fltrble [dried at 105 C]daily maximumreport only (mg/L)Apr001
Solids, total suspendedmonthly average≤ 35 mg/Lall year001
Solids, total suspendeddaily maximum≤ 70 mg/Lall year001
Solids, settleablemonthly averagereport only (mL/L)all year001
Solids, settleabledaily maximumreport only (mL/L)all year001
Iron, total [as Fe]monthly average≤ 3500 ug/Lall year001
Iron, total [as Fe]daily maximum≤ 7000 ug/Lall year001
Manganese, total [as Mn]monthly average≤ 2000 ug/Lall year001
Manganese, total [as Mn]daily maximum≤ 4000 ug/Lall year001
Copper, total recoverablemonthly averagereport only (ug/L)Mar, Jun, Aug, Dec001
Copper, total recoverabledaily maximumreport only (ug/L)Mar, Jun, Aug, Dec001
Rainfallmonthly averagereport only (in)all year001
Rainfalldaily maximumreport only (in)all year001
Flow ratemonthly averagereport only (gal/d)all year003
Flow ratedaily maximumreport only (gal/d)all year003
pHdaily minimum≥ 6.5 SUall year003
pHdaily maximum≤ 9 SUall year003
Residue, tot fltrble [dried at 105 C]monthly averagereport only (mg/L)Apr003
Residue, tot fltrble [dried at 105 C]daily maximumreport only (mg/L)Apr003
Solids, total suspendedmonthly average≤ 35 mg/Lall year003
Solids, total suspendeddaily maximum≤ 70 mg/Lall year003
Solids, settleablemonthly averagereport only (mL/L)all year003
Solids, settleabledaily maximumreport only (mL/L)all year003
Hardness, total [as CaCO3]monthly averagereport only (mg/L)Apr003
Hardness, total [as CaCO3]daily maximumreport only (mg/L)Apr003
Chloride [as Cl]monthly averagereport only (mg/L)Apr003
Chloride [as Cl]daily maximumreport only (mg/L)Apr003
Sulfate, total [as SO4]monthly averagereport only (mg/L)Apr003
Sulfate, total [as SO4]daily maximumreport only (mg/L)Apr003
Iron, total [as Fe]monthly average≤ 3500 ug/Lall year003
Iron, total [as Fe]daily maximum≤ 7000 ug/Lall year003
Manganese, total [as Mn]monthly average≤ 2000 ug/Lall year003
Manganese, total [as Mn]daily maximum≤ 4000 ug/Lall year003
Copper, total recoverabledaily maximum≤ 29 ug/Lall year003
Mercury, total low levelmonthly averagereport only (ng/L)Apr003
Mercury, total low leveldaily maximumreport only (ng/L)Apr003

How strict are these limits?

Cited limits by parameter: Ohio's rules and the federal ones.

Same industry: the 38 Coal Mining permits in Ohio.

Check this month's numbers Email me before each report is due

· Save this facility as a site · Superfund sites nearby · Your permits on one board

On EPA ECHO: Facility report · DMR history

Your permit document is the final word. As JSON: /api/v1/permits/OH0059889 · MCP: https://passage-data.com/mcp