Passage Data · Check a report · Use it from your AI
Sewage treatment plant, Canaseraga, New York. NPDES permit NY0269573, in force until Dec 31, 2027. Last 12 months: over a limit 3 times (last April 2026), 4 required values missing, 1 of 11 reports late. Source: EPA ECHO, Oct 22, 2026.
| Period ending | Parameter | Reported | Limit | Over by |
|---|---|---|---|---|
| October 2025 | BOD, 5-day, 20 deg. C, daily average | 6.6 mg/L | ≤ 5 mg/L | 32% |
| January 2026 | Flow, in conduit or thru treatment plant, monthly average | .15 MGD | ≤ .1 MGD | 50% |
| April 2026 | Flow, in conduit or thru treatment plant, monthly average | .19 MGD | ≤ .1 MGD | 90% |
| Parameter | Statistic | Limit | Months |
|---|---|---|---|
| Temperature, water deg. fahrenheit | daily maximum | report only (deg F) | all year |
| Temperature, water deg. fahrenheit | daily maximum | report only (deg F) | all year |
| Oxygen, dissolved [DO] | minimum | ≥ 7 mg/L | Jun–Oct |
| BOD, 5-day, 20 deg. C | daily average | ≤ 5 mg/L | Jun–Oct |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 30 mg/L | Jan, Feb, Mar, Apr, May, Nov, Dec |
| BOD, 5-day, 20 deg. C | 7-day average | ≤ 45 mg/L | Jan, Feb, Mar, Apr, May, Nov, Dec |
| BOD, 5-day, 20 deg. C | daily average | ≤ 4 lb/d | Jun–Oct |
| BOD, 5-day, 20 deg. C | monthly average | ≤ 25 lb/d | Jan, Feb, Mar, Apr, May, Nov, Dec |
| BOD, 5-day, 20 deg. C | 7-day average | ≤ 38 lb/d | Jan, Feb, Mar, Apr, May, Nov, Dec |
| BOD, 5-day, 20 deg. C | monthly average | report only (mg/L) | all year |
| BOD, 5-day, 20 deg. C | monthly average | report only (lb/d) | all year |
| pH | minimum | ≥ 6 SU | all year |
| pH | maximum | ≤ 9 SU | all year |
| pH | minimum | report only (SU) | all year |
| pH | maximum | report only (SU) | all year |
| Solids, total suspended | daily average | ≤ 10 mg/L | Jun–Oct |
| Solids, total suspended | monthly average | ≤ 30 mg/L | Jan, Feb, Mar, Apr, May, Nov, Dec |
| Solids, total suspended | 7-day average | ≤ 45 mg/L | Jan, Feb, Mar, Apr, May, Nov, Dec |
| Solids, total suspended | daily average | ≤ 8 lb/d | Jun–Oct |
| Solids, total suspended | monthly average | ≤ 25 lb/d | Jan, Feb, Mar, Apr, May, Nov, Dec |
| Solids, total suspended | 7-day average | ≤ 38 lb/d | Jan, Feb, Mar, Apr, May, Nov, Dec |
| Solids, total suspended | monthly average | report only (mg/L) | Jun–Oct |
| Solids, total suspended | monthly average | report only (lb/d) | Jun–Oct |
| Solids, settleable | daily maximum | ≤ .1 mL/L | all year |
| Solids, settleable | daily maximum | report only (mL/L) | all year |
| Nitrogen, ammonia total [as N] | daily average | ≤ 2 mg/L | Jun–Oct |
| Phosphorus, total [as P] | monthly average | report only (mg/L) | all year |
| Flow, in conduit or thru treatment plant | monthly average | ≤ .1 MGD | all year |
| Flow, in conduit or thru treatment plant | daily maximum | report only (MGD) | all year |
| Coliform, fecal general | 30-day geometric mean | ≤ 200 #/100mL | May–Oct |
| Coliform, fecal general | 7-day geometric mean | ≤ 400 #/100mL | May–Oct |
| BOD, 5-day, percent removal | monthly average minimum | ≥ 85 % | all year |
| Solids, suspended percent removal | monthly average minimum | ≥ 85 % | all year |
Cited limits by parameter: New York's rules and the federal ones.
· Save this facility as a site · Superfund sites nearby · Your permits on one board
On EPA ECHO: Facility report · DMR history
Your permit document is the final word. As JSON: /api/v1/permits/NY0269573 · MCP: https://passage-data.com/mcp